Powered by Made-in-China.com
Combined Cycle Power Plant Ccpp
Shandong, ChinaRunh Power Corp., Ltd.
Combined Cycle Power Plant Ccpp
US$1,000,000.00
1 Piece
Product profile
After-sales Service
1 YearWarranty
1 YearCertification
ISOModel NO.
RUNHOutput Type
AC Three PhaseStandard
NonstandardCapacity
1MW~660MWGas Source
GasTransport Package
as Your RequestSpecification
1MW-660MWTrademark
RunhOrigin
ChinaHS Code
8402119000Production Capacity
7-8/YearKey features
High Efficiency: Efficiency can reach up to 60%.
Low Emissions: Minimized carbon dioxide and nitric oxide emissions compared to coal plants.
Fuel Flexibility: Operates on natural gas, distillate oil, crude oil, residual oil, and coal-derived gas.
Rapid Start-up: Allows fast start-up, minimal shut-down times, and efficient load adjustment.
Short Construction Period: Construction time minimized to approximately two and a half years.
Low Installation Cost: Pre-engineered and factory-packaged to reduce installation time and cost.
Modular Design: Self-contained units requiring fewer staff and less space.
Customizable Capacity: Capacity ranges from 1MW to 660MW.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤18h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:What is the warranty period for the power plant?
A:
The warranty period is 1 year.
Q:What is the maximum efficiency of the plant?
A:
The efficiency can be up to 60%.
Q:What types of fuels can the plant use?
A:
It can operate on natural gas, distillate oil, crude oil, residual oil, and coal-derived gas.
Q:How long does the construction period take?
A:
The construction time is around two and a half years.
Q:What is the capacity range of the plant?
A:
The capacity ranges from 1MW to 660MW.
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Green Energy Solutions for Urban Solid Waste Power Plants
US$45,000.00-90,000.00
1 Piece(MOQ)
500kw Wood Chips Rice Husk Biomass Energy Generator Power Plant/Generator Set
US$100.00-1,000.00
1 Piece(MOQ)
Biogas Power Plant From Food and Kitchen Waste Via Anaerobic Digestion
US$140,000.00
1 Piece(MOQ)
Modular 2MW Biomass Pyrolysis Gasification Power Plant in India/400kw Syngas Biomass Gas Biogas Genset CE ISO Manufacturer
US$60,000.00-800,000.00
1 Set(MOQ)
Advanced CFB Circulating Fluidized Bed Biomass Gasification Power Plant
US$795,000.00-820,000.00
1 Piece(MOQ)
Coconut Shell Agricultural Biomass Power Generation Burnergas Generation Plant with Gasifier
US$800,000.00-825,000.00
1 Piece(MOQ)
Rice Husk Straw Wood Chips Biomass Gasification Power Plant
US$7,980.00
1 Piece(MOQ)
24/7 Stable Operation Fully Automatic Control Biomass Power Generation Plant
US$792,500.00-815,000.00
1 Piece(MOQ)
Garbage Power Generation System, Waste Incineration Power Generation Plant Customized
US$2,000,000.00-6,000,000.00
1 Piece(MOQ)
Agro Forestry Waste Wood Rice Husk Applied 1MW-5MW Biomass Power Plant
US$139,000.00-148,000.00
1 Set(MOQ)
Power Biomass Energy Plant Using Wood Waste for Wood Factory
US$795,000.00-815,000.00
1 Piece(MOQ)
500kw Rice Husk Straw Wood Chips Biomass Gasification Power Plant
US$7,980.00
1 Piece(MOQ)
10kw - 5MW Electricity Power Generation Motor Biomass Gasification Power Plant
US$25,000.00
1 Set(MOQ)
Generating Units Application of Gasifier Power Plant
US$25,000.00-1,000,000.00
1 set(MOQ)
Wood Gas Power Plant for Sale
US$25,000.00-1,000,000.00
1 set(MOQ)
200kw Biomass Pyrolysis Oil Generator Set Power Plant
US$100.00-1,000.00
1 Piece(MOQ)
Avespeed Green Energy with 300kw/400V/50Hz Biomass Fuel Power Plant
US$100.00-1,000.00
1 Piece(MOQ)
200kw 400kw 800kw 1MW Wood Chips Biomass Gasifier Power Plant
US$10,000.00-500,000.00
1 Set(MOQ)
Small Electric Gasifier 20kw Biomass Gas Generator Power Plant
US$25,000.00-1,000,000.00
1 set(MOQ)



















