SourcingAI
Try for free
Powered by Made-in-China.com
High Efficiency Condensing Steam Turbine
Negotiable
1 Piece

Product profile

Generating Methods

Thermal Power Generation

Phase

Three Phase

Capacity

1MW~660MW

Model NO.

Steam turbine

Speed

3000r/M; 5600r/M; 6500r/M

Inlet Steam

1MPa~8.83MPa

Inlet Temperature

250c~535c

Maximum Inlet Steam Quantity

6tph~278tph

Cooling Type

Air Cooling/ Water Cooling

Transport Package

Standard Packing

Specification

20MW~660MW

Trademark

Runh Power

Origin

China

HS Code

8402119000

Production Capacity

20/Year

Key features

Customizable Capacity: Capacity ranges from 1MW to 660MW to suit various project scales.
Flexible Speed Options: Speed options include 3000r/M, 5600r/M, and 6500r/M.
Wide Steam Parameters: Inlet steam pressure 1MPa-8.83MPa and temperature 250C-535C.
EPC Turnkey Service: Complete equipment supply including STG, BTG, and BOP for power projects.
Competitive Delivery: Guaranteed competitive delivery time through optimized design and manufacturing.
Global After-Sales Support: One-to-one service, periodic visits, and global maintenance team.
Second-Hand Equipment: Available with renovation, relocation, and upgrade services at lower costs.
Proven International Experience: Over 20 international projects in Turkey, Ukraine, India, and more.

Company profile

Runh Power Corp., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperienceManagement Certification
Runh Power Corp., Ltd.Shandong, China
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120

Our Production Capability & Technical Expertise

Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What is the capacity range of the steam turbine?
A:
The capacity is customizable, ranging from 1MW to 660MW.
Q:What speed options are available?
A:
Speed options include 3000r/M, 5600r/M, and 6500r/M.
Q:What are the inlet steam parameters?
A:
Inlet steam pressure ranges from 1MPa to 8.83MPa, and temperature from 250C to 535C.
Q:Does the supplier offer EPC services?
A:
Yes, we provide EPC/turnkey services and complete set of equipment like STG, BTG, and BOP.
Q:What is the average lead time?
A:
Lead time is typically 3-6 months, 6-12 months, or more than 12 months depending on the season.

Send Inquiry

*To:Runh Power Corp., Ltd.Runh Power Corp., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

8MW Used Condensing Steam Turbine Waste to Energy

8MW Used Condensing Steam Turbine Waste to Energy

US$200,000.00-350,000.00
1 Set(MOQ)
Made-in-China.com
Condensing Steam Turbine for Power Plant

Condensing Steam Turbine for Power Plant

US$1.00-1,000,000.00
1 Piece(MOQ)
Made-in-China.com
Double Extraction Condensing Steam Turbine

Double Extraction Condensing Steam Turbine

US$1,000,000.00-1,500,000.00
1 Piece(MOQ)
Made-in-China.com
150MW Condensing Steam Turbine Used for Power Plant

150MW Condensing Steam Turbine Used for Power Plant

US$1,000,000.00-2,000,000.00
1 Set(MOQ)
Made-in-China.com
Industrial Extraction Condensing Steam Turbine
Made-in-China.com
1.5MW Used Condensing Steam Turbine for Sale Price
Made-in-China.com
1000kw Hydro Turbine for Water Power Station
Made-in-China.com
Double Nozzle Mincro Turgo Turbine
Made-in-China.com
CNG to Power Plant 500kw

CNG to Power Plant 500kw

US$99,999.00
1 Set(MOQ)
Made-in-China.com