SourcingAI
Try for free
Powered by Made-in-China.com
Municipal Solid Waste Power Plant Project (MSW to energy) Renewable Energy
US$1,000,000.00
1 Piece

Product profile

Voltage

Various

Generating Methods

Various

Phase

Various

Model NO.

Various

Maintenance

Available Upon Request

Operation

Available Upon Request

Transport Package

Negociable

Specification

25 to 100 MW

Trademark

Runh

Origin

Shandong Province

Production Capacity

Two Years on Average

Key features

End-to-End EPC Service: Complete package covering project argumentation, design, equipment purchase, civil construction, and installation.
Global Project Experience: Significant experience in MSW energy generation with successful domestic and global project deliveries.
Boiler Corrosion Resistance: Specialized boilers recommended to handle toxic substances and prevent inner wall erosion.
Investment Assistance: Help secure private investment or state bank loans with PPA and Feasibility Report support.
Customized Solutions: Customized models available upon submission of detailed requests for specific operational needs.
Optional O&M Services: Optional operation, maintenance, technical training, and spare parts supply services included.
Flexible Service Models: EPS service (Engineering, Purchase & Supervision) available for local contractor preferences.
High Technical Efficiency: Focus on thermal efficiency improvement and neutralization treatment of smoke and ashes.

Company profile

Runh Power Corp., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperienceManagement Certification
Runh Power Corp., Ltd.Shandong, China
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120

Our Production Capability & Technical Expertise

Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What services are included in the EPC project?
A:
The EPC package covers project argumentation, engineering design, equipment purchase and transportation, civil construction, operation and maintenance, installation and testing, and spare parts supply.
Q:Is customization available for the power plant models?
A:
Yes, customized models are available upon the submission of detailed requests to meet specific operational requirements.
Q:What documents are required for foreign investment approval?
A:
Required documents include Power Purchase Agreement (PPA), Feasibility Report, Sovereign bonds, Construction Permit, Fire permit, Environmental impact assessment, Land Lease, and Power Generation Power.
Q:Can Runh Power help secure financing for the project?
A:
Yes, with at least a PPA and Feasibility Report, Runh Power can help secure private investment or loans from state banks.
Q:What types of boilers are recommended for MSW power plants?
A:
Dual-drum bagasse/bark/oil palm boilers are recommended, with circulating fluidized bed and forced vibration types available for all models.

Send Inquiry

*To:Runh Power Corp., Ltd.Runh Power Corp., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

CNG to Power Plant 500kw

CNG to Power Plant 500kw

US$99,999.00
1 Set(MOQ)
Made-in-China.com
1MW Gas Piston Power Plant Installation
Made-in-China.com
500kw Bio CNG Plant

500kw Bio CNG Plant

US$99,999,999.00
1 Set(MOQ)
Made-in-China.com
100MW- 300MW Used Gas Turbine

100MW- 300MW Used Gas Turbine

US$25,000,000.00-50,000,000.00
1 Set(MOQ)
Made-in-China.com
40MW Used Gas Turbine for Data Center Fast Track

40MW Used Gas Turbine for Data Center Fast Track

US$3,000,000.00-5,000,000.00
1 Set(MOQ)
Made-in-China.com
Second Hand/Used Steam Turbine Power Plant
Made-in-China.com