Powered by Made-in-China.com

Municiple Solid Waste Power Plant EPC
Shandong, ChinaRunh Power Corp., Ltd.
Municiple Solid Waste Power Plant EPC
US$1,000,000.00
1 Piece
Product profile
Voltage
380VGenerating Methods
Thermal Power GenerationPhase
Three PhaseModel NO.
RUNHSize
1MW~50MWTransport Package
Standard PackingSpecification
GB/IBR/ASME/CETrademark
RUNHOrigin
ChinaHS Code
8402119000Production Capacity
1-3/YearKey features
Comprehensive EPC Services: Provides turnkey EPC solutions for thermal, biomass, waste heat, and new energy power projects.
Independent Design Institute: Features 50 experienced engineers capable of creating proposals for power projects of various sizes.
Competitive Delivery Guarantee: Ensures timely delivery through prioritized manufacturing, local branches, and risk management.
Global After-Sales Support: Offers one-to-one service, periodic visits, and a global maintenance team to reduce project risks.
Second-Hand Equipment Options: Provides affordable, renovated second-hand equipment with shorter construction periods and full guarantees.
Proven International Experience: Completed over 100 international projects in Turkey, Ukraine, India, and other regions.
Customizable Power Plant Size: Offers flexible sizing options ranging from 1MW to 50MW to meet specific project requirements.
OEM and ODM Services: Provides full customization from samples and designs with established cooperative OEM relationships.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:What types of power projects does Runh Power handle?
A:
We handle coal-fired, biomass, combined cycle, waste heat, and new energy power projects.
Q:Do you offer customized power plant sizes?
A:
Yes, we provide customization for sizes ranging from 1MW to 50MW.
Q:What is the warranty for second-hand equipment?
A:
Second-hand equipment comes with the same guarantee period as new equipment.
Q:How do you ensure competitive delivery times?
A:
We guarantee delivery through a four-step process: design, prioritized manufacturing, local branch support, and experienced team management.
Q:What after-sales services are provided?
A:
We offer one-to-one service, periodic visits, customer documents, and a global maintenance team.
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Municipal Solid Waste Power Plant Biopower 30MW 35 MW 40 MW 50MW
US$1,000,000.00
1 Piece(MOQ)
Waste Heat Recovery Power Plant Biopower
US$1,000,000.00
1 Piece(MOQ)
CNG to Power Plant 500kw
US$99,999.00
1 Set(MOQ)
Bio-Waste Treatment Power Plant Organic Waste
US$1,000,000.00
1 Piece(MOQ)
1MW Gas Piston Power Plant Installation
US$99,999.00
1 Set(MOQ)
Horizontal Tubular/ Water Turbine/ Hydro Turbine/Power Plant
US$99,999.00
1 Piece(MOQ)
500kw Bio CNG Plant
US$99,999,999.00
1 Set(MOQ)
Coal to Fire Power Plant 20 MW 30 MW 50 MW 100MW 200MW 300MW Ethiopia
US$1,000,000.00
1 Piece(MOQ)
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
US$1,000,000.00
1 Piece(MOQ)
100MW- 300MW Used Gas Turbine
US$25,000,000.00-50,000,000.00
1 Set(MOQ)
20 MW 50 MW 100MW Agricultural Waste Coal-Fired Steel Structure Power Plant
US$1,000,000.00
1 Piece(MOQ)
50 MW 100MW Coal Fired Power Plant EPC Contractor
US$1,000,000.00
1 Piece(MOQ)
40MW Used Gas Turbine for Data Center Fast Track
US$3,000,000.00-5,000,000.00
1 Set(MOQ)
Pelton Turbine / Impulse Turbine / Hydro Turbine / Water Turbine
Negotiable
1 Set(MOQ)
Second Hand/Used Steam Turbine Power Plant
US$500,000.00
1 Piece(MOQ)
6MW Used Steam Turbine for Power Plants in Sugar Mill, Textile Mill, Paper Mill
US$150,000.00-300,000.00
1 Set(MOQ)
1.5MW Used Steam Turbine for Power Plants in Sugar, Textile, Food, Chemical
US$50,000.00-100,000.00
1 Set(MOQ)



















