SourcingAI
Try for free
Powered by Made-in-China.com
Soda Factory Power Plant EPC for Electricity Generation
US$150,000.00
1 Piece
Sample price:US$1000000.00/piece.Request sample

Product profile

Function

Water Boiler, Steam Boilers, Hot Water Boiler, Hot Air Boiler

Fuel

Coal-Fired

Installation

Packaged Boiler

Model NO.

RUNH

Structure

Water Tube

Media

Steam and Water

Water Circulation

Natural Circulation

Drum Placement

Vertical Boiler

Pressure

High Pressure

Burning Style

Chamber Combustion Boiler

Usage

Industrial, Home, Vehicle, Power Station

Capacity

Customized

Transport Package

Standard Packing

Specification

1-60mw

Trademark

RUNH

Origin

China

HS Code

8402119000

Production Capacity

7

Key features

Comprehensive EPC Services: Feasibility study, design, engineering, procurement, construction, and operation support.
Full Customization Options: Customization available from samples, designs, and full customization capabilities.
Diverse Fuel Compatibility: Supports coal, diesel, gas, biomass, biogas, waste-to-energy, and geothermal sources.
Advanced Turbine Solutions: Offers back pressure, condensing, extracting, and inducting steam turbines.
Global Project Experience: Projects completed in India, Pakistan, Indonesia, Russia, Turkey, and over 15 countries.
Complete Spare Parts Supply: Wide range of spare and quick-wear parts for independent maintenance support.
100% Product Inspection: All finished products undergo visual and function inspection before delivery.
OEM and ODM Services: Full OEM and ODM services available for tailored power plant solutions.

Company profile

Runh Power Corp., Ltd.
Years of Export ExperienceExperienced TeamExhibition ExperienceManagement Certification
Runh Power Corp., Ltd.Shandong, China
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h

About Our Factory & Business Background

AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120

Our Production Capability & Technical Expertise

Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500Yes

Product Q&A

Q:What types of power plants does Runh Power provide EPC services for?
A:
We provide EPC services for thermal, biomass, animal dung, municipal solid waste, and combined cycle power plants.
Q:Can the power plant capacity be customized?
A:
Yes, full customization options are available, including customization from samples and designs.
Q:What is the minimum order quantity for the equipment?
A:
The minimum order quantity is 1 set.
Q:What are the available payment terms?
A:
We accept LC (Letter of Credit) and T/T (Telegraphic Transfer) as payment terms.
Q:What is the lead time for production?
A:
Lead time varies by season: 3-6 months in off-peak, 6-12 months in peak, or over 12 months for complex projects.

Send Inquiry

*To:Runh Power Corp., Ltd.Runh Power Corp., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

EPC Power Plant for Cement Factory

EPC Power Plant for Cement Factory

US$1.00-1,500,000.00
1 Piece(MOQ)
Made-in-China.com
Continuous Process Pyrolysis Plant for Tyre and Plastic

Continuous Process Pyrolysis Plant for Tyre and Plastic

US$588,000.00-1,505,000.00
1 Piece(MOQ)
Made-in-China.com
Tyre Pyrolysis Plant China

Tyre Pyrolysis Plant China

US$588,000.00-1,505,000.00
1 Piece(MOQ)
Made-in-China.com
50tpd Tyre Pyrolysis Plant Automatic

50tpd Tyre Pyrolysis Plant Automatic

US$588,000.00-1,505,000.00
1 Piece(MOQ)
Made-in-China.com
50tpd Fully Continuous Pyrolysis Plant to Diesel Oil

50tpd Fully Continuous Pyrolysis Plant to Diesel Oil

US$588,000.00-1,505,000.00
1 Piece(MOQ)
Made-in-China.com