Powered by Made-in-China.com
Thermal Power Plant Equipment Supplier
Shandong, ChinaRunh Power Corp., Ltd.
Thermal Power Plant Equipment Supplier
Negotiable
1 Piece
Product profile
Voltage
10kVGenerating Methods
Thermal Power GenerationPhase
Three PhaseModel NO.
1-660MWSize
1mw~660mwTransport Package
Standard PackingSpecification
ISO9001; ASME/GB/IBR/CETrademark
RUNHOrigin
ChinaHS Code
8402119000Production Capacity
5-10/YearKey features
18 Years Industry Experience: Over 20 international power projects delivered in Turkey, Ukraine, and India.
Complete EPC & Turnkey Service: Full solution including STG, BTG, BOP for coal, biomass, CCPP, and waste heat plants.
Professional Design Institute: 50 experienced engineers providing proposals for power projects of various sizes.
Cost-Effective Equipment: Cooperative OEMs with advanced technology and competitive pricing.
Competitive Delivery Time: Guaranteed schedule via design, manufacturing, local branches, and expert teams.
Global After-Sales Service: One-to-one service, periodic visits, and global maintenance team support.
Second-Hand Equipment Options: Renovation, relocation, and upgrades with same guarantee period as new equipment.
Full Customization Available: Customization from samples, designs, or full customization options provided.
Company profile
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 19 Years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h
About Our Factory & Business Background
AddressBlock C, Yinfeng Fortune Plaza, No. 1 Longao West Road, Lixia District, Jinan, Shandong, China
Plant Area3636 square meters
Number of Employees167
Registered Capital80,000,000 RMB
Terms of PaymentLC, T/T
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: 3-6 months, 6-12 months, more than 12 months Off Season Lead Time: 3-6 months, 6-12 months, more than 12 months
Minimum Order Quantity1 Set
Supply Chain Partners120
Our Production Capability & Technical Expertise
Main ProductsPower Plant, Steam Turbine, Boiler, Energy Boiler, Power Plant EPC Contractor, Power Plant Turnkey Contractor, Generator, Combined Cycle Power Plant, Biomass Power Plant, Coal-Fired Power Plant
QA/QC inspectors9 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers25 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2004-04-14
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice30%~50%
Annual Export Revenue35,000,000 USD
Number of Foreign Trading Staff84
Overseas Agent/BranchYes
New Products Launched in Last yearNo
Our Certifications, Standards & Industry Recognition
Cooperated with Fortune 500Yes
Product Q&A
Q:What is the warranty period for second-hand equipment?
A:
We provide the same guarantee period for second-hand equipment as we do for new equipment.
Q:Can you customize the equipment size?
A:
Yes, we offer full customization with size options ranging from 1MW to 660MW.
Q:What is your average lead time?
A:
Lead times vary by season and project complexity, ranging from 3-6 months to over 12 months.
Q:Do you provide after-sales service for international projects?
A:
Yes, we offer complete after-sales service including one-to-one support, periodic visits, and a global maintenance team.
Q:What payment terms do you accept?
A:
We accept LC (Letter of Credit) and T/T (Telegraphic Transfer) as payment terms.
Send Inquiry
*To:
Runh Power Corp., Ltd.
Runh Power Corp., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Second Hand Industrial Power Plant Equipments
US$150,000.00
1 Piece(MOQ)
Palm Tissue-Fired Biomass Renewable Energy Power Station Contractor & Equipment Supplier
US$150,000.00
1 Piece(MOQ)
CNG to Power Plant 500kw
US$99,999.00
1 Set(MOQ)
Coal to Fire Power Plant 20 MW 30 MW 50 MW 100MW 200MW 300MW Ethiopia
US$1,000,000.00
1 Piece(MOQ)
Coal Fire Steam Turbine Power Plant 6 MW 12 MW 20 MW 25MW 100MW 125MW 200 MW
US$1,000,000.00
1 Piece(MOQ)
1MW Gas Piston Power Plant Installation
US$99,999.00
1 Set(MOQ)
Condensing Steam Steam Turbine Wood Rice Husk Coal Power Plant
US$1,000,000.00
1 Piece(MOQ)
Waste to Power Plant Coal Fired Biomass Fired Power Plant
US$1,000,000.00
1 Piece(MOQ)
Horizontal Tubular/ Water Turbine/ Hydro Turbine/Power Plant
US$99,999.00
1 Piece(MOQ)
500kw Bio CNG Plant
US$99,999,999.00
1 Set(MOQ)
Wheat Straw Biomass Generator Thermal Electricity Generation System Power Plant
US$1,000,000.00
1 Piece(MOQ)
Wheat Straw Thermal Electricity Generation System Biomass Generatorbiomass Generator Power Plant
US$1,000,000.00
1 Piece(MOQ)
40MW Used Gas Turbine for Data Center Fast Track
US$3,000,000.00-5,000,000.00
1 Set(MOQ)
Thermal Electricity Generation System Biomass Generator Biomass Power Plant
US$1,000,000.00
1 Piece(MOQ)
Chinese Contractor of Thermal Power Plant Project
US$1,000,000.00
1 Piece(MOQ)
100MW- 300MW Used Gas Turbine
US$25,000,000.00-50,000,000.00
1 Set(MOQ)
Second Hand/Used Steam Turbine Power Plant
US$500,000.00
1 Piece(MOQ)
Pelton Turbine / Impulse Turbine / Hydro Turbine / Water Turbine
Negotiable
1 Set(MOQ)



















