Powered by Made-in-China.com
Galvanized Steel Forged Formwork Clamp Scaffolding for Formwork Construction Doka
US$4.20-5.95
1,000 Pieces
Product profile
Customization
AvailableConnection Type
Clamp ConnectionFinish
GalvanizedModel NO.
WY-M004Material
SteelType
Formwork AccessoriesAfter-Sales Service
2yearsWarranty
2yearsCertification
ISOTransport Package
Steel PalletSpecification
85.5mmTrademark
WEIYEOrigin
RizhaoHS Code
73084000Production Capacity
2500tons /MonthKey features
25 Years Manufacturing Experience: Leading manufacturer with 25 years of expertise in scaffolding and formwork accessories.
International Certifications: Products certified by BS 1139, EN 74, and AS 1576 for high quality and safety.
High Production Capacity: Capable of producing more than 20 containers per month with advanced forging lines.
Customizable Dimensions: Different types with various diameters and lengths can be supplied as per requirements.
Durable Galvanized Finish: Zinc plated surface treatment ensures corrosion resistance and long-lasting durability.
Global Market Presence: Products are widely exported to Europe, Australia, North America, and Southeast Asia.
Integrated Manufacturing: Own zinc plating, powder coating, and casting workshops ensure consistent quality.
Comprehensive Product Range: Offers system scaffolding, couplers, shoring props, and various formwork accessories.
Company profile
Business Type: Manufacturer/FactoryExport Year: 2012-02-01Nearest Port: Qingdao PortAverage Response Time: ≤4.92hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, CIP, CPT, FCA
AI-Powered supplier vetting
SummaryThe supplier is identified as a professional technical supplier with customization, ODM, and OEM capabilities, but it does not provide 3D software design, SDKs, or overseas service infrastructure. Its stated annual production capacity includes 6,000 tons of steel scaffolding, 5,000 tons of scaffolding couplers, 4,000 tons each of scaffolding planks and jack bases, and 3,000 tons of formwork accessories, supported by five quality inspectors. Export experience is substantial, with 90% of sales from exports and 15 years of exporting. Quality procedures and traceability exist, but several service, complaint, and quality records lack documented evidence. Financial periods are identified for 2021–2023, but no financial results are provided. No customer names or specific customer cases are disclosed.
Supplier typeThe supplier explicitly identifies itself as a professional technical supplier. It also provides customization from samples, designs, and minor customization, indicating a technical manufacturing orientation.
R&D capabilityThe supplier offers customization and ODM services, but it does not provide 3D software design or an SDK, and reports no new products during the past year. These explicit limitations prevent a positive assessment of current innovation capability.
Production capacityThe supplier reports annual capacities of 6,000 tons of steel scaffolding, 5,000 tons of scaffolding couplers, 4,000 tons each of scaffolding planks and jack bases, and 3,000 tons of formwork accessories. It also has five quality inspectors, uniformly followed finished-product inspection instructions, 90% export sales, and 15 years of export experience.
Customization capabilityThe supplier explicitly supports customization from samples, customization from designs, and minor customization. It also provides ODM services and OEM services for popular brands, demonstrating multiple stated customization and design-manufacturing routes.
Product Q&A
Q:What certifications do your products have?
A:
All our products are certified by BS 1139, EN 74, and AS 1576, ensuring high quality and safety standards.
Q:What is the warranty period for this formwork clamp?
A:
We provide a 2-year warranty and after-sales service for our formwork accessories.
Q:Can you supply different sizes or diameters?
A:
Yes, different types with various diameters and standard lengths (e.g., 200mm, 300mm) can be supplied.
Q:What is the average lead time for orders?
A:
The lead time is within 15 workdays during the off-season and one month during the peak season.
Q:What payment methods do you accept?
A:
We accept LC, T/T, PayPal, Western Union, small-amount payments, and Alibaba Trade Assurance.
Send Inquiry
*To:
Rizhao Weiye Tools Co., Ltd.
Rizhao Weiye Tools Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Peri/Doka/Meva Formwork Clamp Formwork Lock Construction Scaffolding
US$1.00-15.00
1,000 Pieces(MOQ)
Construction Formwork Scaffolding Steel Rasto System Ajustable Splice Clamp Universal Clamp
US$10.50-10.70
1,000 Pieces(MOQ)
Galvanized Adjustable Steel Prop Sleeve Scaffolding Prop Sleeve and Nut for Construction
US$0.20-0.50
1,000 Pieces(MOQ)
Scaffolding Scaffold Alignment Clamp Bfd for Peri Formwork Panel Maximo and Trio for Construction
US$6.70-6.90
1,000 Pieces(MOQ)
Q235 Steel H Frame Scaffolding System for Concrete Slab Formwork Construction
US$7.65-8.65
500 Pieces(MOQ)
Rasto Clamp Steel Rasto Ajustable Splice Rasto Aligning Clamp Corner Clamp for Construction Formwork Scaffolding
US$10.50-10.70
1,000 Pieces(MOQ)
Premium Galvanized Steel Ringlock Scaffolding System for High-Quality Constructions
US$4.00-10.00
1,000 Pieces(MOQ)
Girder Clamps Scaffold Forged Steel Component for Building Construction Scaffolding
US$2.00-4.50
1,000 Pieces(MOQ)
Forged Double Joint Fasteners for Scaffolding Pipe Galvanized Scaffold Clamp with High Strength
US$0.75-2.00
1,000 Pieces(MOQ)
High Strength Scaffolding Toe Board Clamp Galvanized Steel Scaffold Board Holder for Construction Scaffolding System
US$0.03-0.05
3,000 Pieces(MOQ)
Q235 Galvanized Steel Scaffolding Folding Tripod for Adjustbale Shoring Props Construction
US$9.35-10.89
500 Pieces(MOQ)



















