Powered by Made-in-China.com

ASME Standrd Power Station Boiler Steam Manifold Header Pipe
US$1,800.00-3,500.00
1 Ton
Product profile
Customization
AvailableCertification
CE, ISOCustomized
CustomizedSurface Treatment
PaintedRange of Applications
IndustrialType
Boiler HeaderApplication
Boiler SystemMetrial
SUS/Alloy/CarbonDelivery
30 DaysWarranty
1 YearTransport Package
Frame PackingTrademark
SAT-CHAMOrigin
Suzhou, ChinaProduction Capacity
500 Tons/MonthKey features
Customizable Dimensions: Tube size and dimensions are fully customizable to meet specific project requirements.
Wide Material Selection: Available in Carbon steel, Alloy steel, and special materials like SA-335P91 for high resistance.
Strict Quality Control: 100% inspection including RT, PT, and hydraulic pressure tests to ensure safety and durability.
Energy Saving Design: Optimized heat transfer area and water cooling design to improve boiler efficiency and reduce energy loss.
Certified Standards: Manufactured in compliance with ISO9001 and ASME standards for industrial reliability.
Fast Delivery: Standard delivery time is 30 days, ensuring timely supply for your boiler system projects.
OEM/ODM Support: Full customization services including design, samples, and flexible manufacturing options.
Professional Installation: Pre-combined components reduce installation workload and improve convenience on-site.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 Year CertifiedNearest Port: Shanghai PortAverage Response Time: >24h
AI-Powered supplier vetting
SummaryThe supplier is identified as a professional technical supplier with R&D, 3D software design, ODM, OEM, and broad customization capabilities. It operates production workshops with tube welding, tube bending, polishing, finishing, and hydraulic equipment, and has documented inspection, quality-control, complaint-handling, and corrective-action procedures. ISO9001:2015 certification is reported. However, raw-material traceability is absent, no new product was reported in the past year, export experience is limited to one year, and no cooperation with Fortune 500 companies is stated. Financial information is referenced for multiple years, but the provided slices do not establish financial strength or credibility.
Supplier typeThe supplier is explicitly described as a professional technical supplier and its business scope includes special-equipment design, inspection, sales, rental, renovation, and repair. Its stated facilities, production workshops, and engineering personnel further support classification as a technical manufacturing supplier.
CertificationsThe supplier reports holding an ISO9001:2015 certificate for its management system. Other product-compliance and raw-material certifications are described only as 'Others,' so no additional specific certification can be verified.
After-Sales capabilityThe supplier has a documented and followed procedure for handling customer complaints, maintains quality-control records, and has a corrective and preventive action procedure with records. These facts support structured post-sale issue handling, although no direct service-performance results are provided.
Production capacityProduction resources include single- and multirow tube welding machines, tube bending machines, polishing and flat-steel finishing machines, and hydraulic equipment. The supplier reports three production workshops, an external production site, 50 employees, six engineering and technical personnel, and documented finished-product inspection procedures.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization. Its 3D software design capability and ODM service further support the ability to develop customized products.
Product Q&A
Q:What is the warranty period?
A:
We provide 18 months warranty for all spare parts (excluding fragile parts).
Q:How can you guarantee quality?
A:
1. All machines strictly follow ISO quality and CE system requirements. 2. Each procedure is crafted by professional skilled labor with particular QC. 3. All product information can be checked in our efficient management system.
Q:What products can you supply?
A:
We supply Boiler Economizer, Boiler Fin tube, Boiler Air preheater, Boiler superheater, Boiler membrane wall, Boiler manifold headers, and other pressure spare parts.
Q:What services do you provide?
A:
Before sales, we provide product information, market research forecasting, product customization, product processing, and consultation services.
Q:Are you a factory or trading company?
A:
We are a factory located just 130km (2 hours by car) away from Shanghai Airport. We offer pickup service at Shanghai for your visit.
Send Inquiry
*To:
Jiangsu Sat-cham Energy Technology Co., Ltd
Jiangsu Sat-cham Energy Technology Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
China Supplier10# Steel Steam Boiler Superheater Bended Pipes
US$1,600.00-2,000.00
1 Set(MOQ)
China Supplier 10# Steel Steam Boiler Superheater Bended Pipes
US$1,600.00-2,000.00
1 Set(MOQ)
China Supplier Steam Boiler Tubes Membrane Water Wall Pipes
US$1,200.00-1,500.00
1 Ton(MOQ)
Low Carbon Steel Steam Boiler Superheater Bended Pipes
US$1,600.00-2,000.00
1 Set(MOQ)
China Factory Supplier Bended Pipes for Boiler Spare Parts Superheater
US$1,600.00-2,000.00
1 Set(MOQ)
P91 Ultra High Pressure Superheater Tube Anti-Creep Pipe for Ultra Supercritical Power Station Boiler
US$0.7226-1.45
50 kilogram(MOQ)
Boiler Tube Parts H Fin Pipe with ND Steel 316L 304 Ss Material
US$2,000.00-20,000.00
10 Tons(MOQ)
Bolier Spare Parts Manufacture Steam Boiler Tube Superheater and Reheater Tube/Pipe
US$1,500.00-1,800.00
1 Ton(MOQ)
Premium H-Type Fin Pipe for Marine Boiler Applications
US$10.00
1 Piece(MOQ)
ASTM T11 Heat Exchanger Finned Pipe for Boiler Water Wall
US$1,550.00
1 Ton(MOQ)
Quality H Finned Tubes Carbon Steel 20g SS316 225 Fin Pipes for Boiler Heaters
US$1,200.00-1,500.00
10 Tons(MOQ)
ASTM Standard Steel Tube Fin Pipe for Boiler Economizer
US$1,800.00-2,000.00
1 Ton(MOQ)
SA213 T9 High Temperature Superheater Tube Corrosion Resistant Pipe for CFB Circulating Fluidized Bed Boiler
US$0.7226-1.45
50 kilogram(MOQ)
Waste Heat Boiler Economizer H Fin Tubes, Serpentine Economizer Finned Steel Pipe
US$1,000.00-1,500.00
1 Ton(MOQ)
Energy Saving Heat Transfer Extruded Spiral Cooling Fin Pipe
US$10.00-20.00
10 Meters(MOQ)
High-Quality Alloy Steel Radiator Finned Pipe for Advanced Heat Exchanger Solutions
US$1,300.00-1,500.00
3 Tons(MOQ)
High Quality Boiler Economizer Stainless Steel Carbon Steel Fin Tube Pipes
US$8,000.00-25,000.00
10 Tons(MOQ)
500mm Black Twin Wall Flue Pipe for Fireplace
Negotiable
100 Pieces(MOQ)



















