SourcingAI
Try for free
Powered by Made-in-China.com
Ultimate Portable Stackable Power Station with 48V LiFePO4 Battery
US$496.60
1 Piece
Sample price:US$1000.00/piece.Request sample

Product profile

Customization

Available

Type

Li-ion Battery

Cathode Material

LFP

Model NO.

10KWH

Rechargeable

Yes

Size

Small

Battery Type

LiFePO4/Ncm

Usage

Home Use

Capacity

102ah

Battery Cells

Prismatic Cells

Voltage

51.2V

Transport Package

Carton Box

Specification

Customized

Trademark

Customized

Origin

Made in China

HS Code

85076090

Production Capacity

10000PCS

Key features

High-Capacity LiFePO4 Battery: 102Ah 51.2V LFP battery offering 5.2kWh energy storage for reliable power.
High-Efficiency Solar Charging: Supports up to 5.5KW solar input with 80A current and 98% max efficiency.
Customizable Color Options: Available in white and black with customizable color options to match preferences.
Durable Sheet Metal Construction: Crafted from cold-rolled steel plate for robust protection and longevity.
Versatile Frequency Adjustment: Output frequency adjustable to 60Hz or 50Hz to suit various regional requirements.
OEM/ODM Customization Service: Offers full, minor, and flexible customization from samples or designs.
Compact and Portable Design: Small size 385*535*335mm, weighing approx 60KG for easy integration.

Company profile

Guangzhou LiSheng Electronics Co., Ltd.
Fast DeliveryManagement CertificationProduct CertificationODM Services
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 8 years CertifiedNearest Port: Guangzhou Port, Shenzhen PortAverage Response Time: ≤0.25h

About Our Factory & Business Background

AddressFloor 7th, Block a, No. 08 Xianke 1st Road, Huadong Town, Huadu District, Guangzhou, Guangdong, China
Number of Employees24
Registered Capital1,000,000 RMB
Terms of PaymentT/T, PayPal, Western Union
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays, one month
Supply Chain Partners6

Our Production Capability & Technical Expertise

Main ProductsLithium Battery Pack, LiFePO4 Battery Cells, LiFePO4 Battery Pack, Battery Pack, Rechargeable Battery, Power Bank, LiFePO4 Storage Battery Packs, Lithium Ion Battery Cells, Alkaline Battery AA AAA 9V,
Production Lines5
Production MachinesAutomatic integrated production line for battery packs, Aging Testing equipment, Sorting welding machine integrated unit
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2017-06-23
Main MarketsNorth America, South America, Southeast Asia/ Mideast
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff6
Overseas Agent/BranchNo
New Products Launched in Last yearYes

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015
Product CertificationCCC, CE, Others
Cooperated with Fortune 500No

Product Q&A

Q:What is the battery capacity and voltage?
A:
The battery features a 102Ah capacity with a nominal voltage of 51.2V, providing 5.2kWh of energy storage.
Q:Can the solar charging power be adjusted?
A:
Yes, the solar charging power range supports up to 5.5KW, with a PV charging current of 80A and MPPT voltage range of 120-450Vdc.
Q:Is the color of the product customizable?
A:
Yes, while standard colors are white and black, customizable color options are available to match your aesthetic preferences.
Q:Does the company offer OEM or ODM services?
A:
Yes, OEM and ODM services are available, including full customization, minor customization, and flexible customization from samples or designs.
Q:What is the lead time for production?
A:
The average lead time is within 15 workdays during the off-season and within one month during the peak season.

Send Inquiry

*To:Guangzhou LiSheng Electronics Co., Ltd.Guangzhou LiSheng Electronics Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like