SourcingAI
Try for free
Powered by Made-in-China.com
Mts Carbide 55 HRC 4 Flutes Chamfer Drill with Good Price-5
US$1.77-11.02
5 Pieces

Product profile

Customization

Available

Coating

Coating

Material

Cemented Carbide

Standard Size

0.2-20mm

Over Length

50-150mm

Flutes

4f

Coated

Tisin

Delivery Time

3-10days

Shipping Way

UPS/FedEx/DHL/TNT/EMS

Label/Laser Tag

Customized

Other Size

Customized

Transport Package

Plastic Box, out Pack: Carton

Specification

D0.2-D20mm

Trademark

MTSTOOLS

Origin

China

HS Code

8207709000

Production Capacity

10, 000, 000PCS/Year

Key features

High Hardness Material: Made of YG10X, ZK30UF, ZK40SF, GU25UF with HRA up to 94.3 and hardness up to 4000HV.
Versatile Flute Options: Available in 2, 3, or 4 flutes for slotting, side milling, heavy cutting, and finishing.
Wide Material Compatibility: Suitable for Carbon Steel, Alloy Steel, Cast Iron, Stainless Steel, Aluminum, and Copper.
Customized Sizes Available: Standard sizes 0.2-20mm, over length 50-150mm, and other sizes fully customizable.
OEM and ODM Services: Full customization from samples or designs with professional manufacturing capabilities.
Fast Sample Delivery: Samples ready in 3-7 days and arrive in 3-5 workdays via express shipping.
ISO 9001 Certified: Manufacturer with ISO9001:2015 certification and 100% finished product inspection.

Company profile

Sichuan Mingtaishun Carbide Co., Ltd.
High Repeat Buyers ChoiceExhibition ExperienceIn-stock CapacityOEM Services
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs CertifiedExport Year: 9 Years CertifiedNearest Port: Shenzhen Port.Average Response Time: ≤0.95h

About Our Factory & Business Background

AddressJingkai Qu, Hedong Dadao, Suining, Sichuan, China
Plant Area9988.53 square meters
Number of Employees48
Registered Capital30,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays
Supply Chain Partners100

Our Production Capability & Technical Expertise

Main ProductsEnd Mill, Endmill, Carbide, Carbide Tools, CNC Tools, Milling Cutter, Milling, Drill, Insert, Cutting Tools
Production Lines1
Production Machines5-axis CNC Grinder, Circular grinding machine, High-precision electricdrive servo press, Low Pressure Sintering Furnace, Powder Blending Equipment, Powder Spray Drying Tower, Step Grinder, Tool passivation and polishing machine
QA/QC inspectors2 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsNo

Our Industry Experience & Global Business Record

Year of Establishment2016-07-28
Main MarketsSouth America, Europe, Southeast Asia/ Mideast
Number of Foreign Trading Staff8
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Management System CertificationISO9001:2015

Product Q&A

Q:When can I get the price?
A:
We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email so that we will regard your inquiry priority.
Q:How can I get a sample to check your quality?
A:
After price confirmation, you can require for samples to check our quality. If you just need a blank sample to check the design and paper quality, we will provide you sample for free, as long as you afford the express freight.
Q:How long can I expect to get the sample?
A:
After you pay the sample charge and send us confirmed files, the samples will be ready for delivery in 3-7 days. The samples will be sent to you via express and arrive in 3-5 workdays. You can use your own express account or prepay us if you do not have an account.
Q:How long does the whole procedure being worked out?
A:
After you place a order, the production handling time is about 30 days. We need 15 days to prepare all the stuff then 15 days for manufacturing.
Q:What about the transportation and delivery date?
A:
Normally we use air transport to transport the goods. It is about 5-15 days. It also depends on which country and port you are. It could be shorter if you need to send the goods like Asian.

Send Inquiry

*To:Sichuan Mingtaishun Carbide Co., Ltd.Sichuan Mingtaishun Carbide Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Hot Sale Long Shank Milling Tools with Tisin Coating
Made-in-China.com