Powered by Made-in-China.com
F1300 F1000 API Valve Assembly for Mud Pump
US$33.00
1-4 Pieces
US$20.00
5+ Pieces
Product profile
Customization
AvailableAfter-sales Service
Online, EngineerWarranty
1 YearModel NO.
F800Manufacturing Process
StampingSurface Treatment
Spray-PaintOperation Pressure
Atmospheric PressureMaterial
AlloyFeatures
Oil Resistant, Corrosion Resistant and Wear-ResistWorking Temperature
-35 C -100 CWork Pressure
40MPaNormal Life
300 Hours of Continuous OperationTransport Package
Export PackingTrademark
BEYONDOrigin
ChinaHS Code
8413502090Production Capacity
20000sets/YearKey features
Premium Forged Alloy Steel: Valve and seat made of one-piece premium forged alloy steel for accurate size and good finish.
High Surface Hardness: Advanced heat treatment ensures surface hardness up to HRC58 with high strength and ductility.
Durable Seal Material: Seal made of polyurethane or synthetic rubber offering high wear resistance and long service life.
Easy Maintenance: Valve assembly designed for easy removal and replacement to minimize downtime.
Oil and Corrosion Resistant: Features oil resistance, corrosion resistance, and wear resistance for harsh environments.
Wide Temperature Range: Operates effectively in temperatures ranging from -35 C to 100 C.
High Pressure Capacity: Designed to withstand working pressure up to 40MPa.
Flexible Customization: Offers full, minor, and flexible customization from samples or designs.
Company profile
Business Type: Trading Company CertifiedR&D Capacity: OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 9 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤7.03h
About Our Factory & Business Background
AddressNo. 901, Haidai Fortune Plaza, East Fangongting Road, Qingzhou City, Weifang, Shandong, China
Terms of PaymentLC, T/T, D/P
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month
Minimum Order Quantity1 set
Supply Chain Partners150
Our Production Capability & Technical Expertise
Main ProductsMud Pump, Oil Drilling Rig, Workover Rig, Drilling Equipment Parts, Mud Pump Parts, Wellhead Handling Tools, Solid Control, Hydraulic Power Tongs, Bop
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers1 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Main MarketsWest Asia
Annual Export Revenue3,070,870 USD
Number of Foreign Trading Staff18
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Product Q&A
Q:What is the warranty period for this product?
A:
We provide a 1-year warranty for the F1300 F1000 API Valve Assembly.
Q:What materials are used for the valve assembly?
A:
The valve and valve seat are made of one-piece premium forged alloy steel.
Q:What is the maximum working pressure?
A:
The valve assembly can handle a working pressure up to 40MPa.
Q:Can this product be customized?
A:
Yes, we offer full, minor, and flexible customization options based on samples or designs.
Q:What is the minimum order quantity?
A:
The minimum order quantity is 1 set.
Send Inquiry
*To:
Shandong Beyond Petroleum Equipment Co., Ltd.
Shandong Beyond Petroleum Equipment Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Valve Assembly, Valve Body and Valve Seat for API Standard Oil Drilling Mud Pump Parts
US$47.00-50.00
5 Pieces(MOQ)
API Mud Pump Valve Body Valve Assembly for Drilling Rig
US$60.00-80.00
1 Piece(MOQ)
API 7K Valve Assembly for Mud Pump Spares Parts Valves
US$29.00-79.00
6 Pieces(MOQ)
High-Performance Mud Pump Valve Seat Assembly for F800 F1000
US$30.00-80.00
1 Piece(MOQ)
Mud Pump Spares API 8# Valve Assembly for 14p220
US$100.00
1 Piece(MOQ)
Oil Drilling Mud Pump Spare Valve Body and Valve Seat/Valve Assembly for Pz-7 Mud Pump
US$50.00-53.00
5 Pieces(MOQ)
API 8# Mud Pump Spares Parts Valve Assembly Valve Body Valve Seat for 14p220
US$38.00
1 Piece(MOQ)
High-Quality F800 F1000 Mud Pump Valve for Bomco Systems
US$30.00-80.00
1 Piece(MOQ)
Petroleum Exploration Mud Pump Parts 7V1# Valve Assembly for F1600
US$36.00-59.00
10 Pieces(MOQ)
Valve Assembly, Valve Body and Valve Seat for API Standard Oil Drilling Mud Pump Parts
US$499.00-600.00
3 pieces(MOQ)
Valve Assembly for Mud Pump API-5#API-6#API-7#API-8# 7V1
US$20.00-80.00
1 Piece(MOQ)
Valve Assy / Valve Body / Valve Seat and Insert for API F1000 Mud Pump
US$10.00-80.00
2 Pieces(MOQ)
API Standard Mud Pump Spare Parts Mud Pump Valve Assembly for Oil Drilling
US$20.00-50.00
5 Pieces(MOQ)
F500 F800 F1000 F1300 Mud Pump Accessories Valve Box
US$790.00-990.00
1 Piece(MOQ)
API Drilling Mud Pump Part Bomco F800 F1000 F1300 F1600 Mud Pump Valve and Seats
US$20.00-50.00
5 Pieces(MOQ)
API Mud Pump Parts Valve Assembly for Oil Drilling
US$300.00-400.00
1 Piece(MOQ)
API Mud Pump Valve Body for Bomco Discharge Cylinder Assembly
US$5,500.00-6,000.00
2 pieces(MOQ)
Valve Assembly for Gardner Denver Pz-7 Triplex Drilling Mud Pump
US$68.00-98.00
1 Piece(MOQ)



















