SourcingAI
Try for free
Powered by Made-in-China.com
Dust Free Mobile Bulk Truck Loading Machine for Cement Plant
US$10,000.00
1 Set

Product profile

Customization

Available

After-sales Service

Provide a Complete Installation and Operation Manu

Warranty

One Year

Type

Piston Filling Machine

Automatic Grade

Automatic

Material Type

Powder

Filling Valve Head

Single-Head

Feed Cylinder Structure

Multi-Room Feeding

Dosing Device

Capacity Cup

Filling Principle

Atmospheric Pressure

Packaging Container Lifting Structure

Chute Lifting

Structure

Linear

Packaging

Tank

Packaging Material

Composite Materials

Product Name

Mobile Bulk Truck Loading Machine

Working Mode

Continuous Operation

Loading Capacity

20-300 Tph

Loading Speed

Adjustable

Loading Height

Customizable

Telescopic Stroke

1-6 M

Conveyor Length

Customized

Hopper Volume

Customized

Air Consumption

Customized

Power Consumption

Low Energy Consumption

Conveyor Type

Screw Conveyor

Conveying Method

Mechanical Conveying

Conveying Distance

Customized

Screw Speed

Variable Frequency Adjustable

Anti Blocking Device

Equipped

Specification

accordingly

Trademark

SDCAD

Origin

China

HS Code

8474900000

Production Capacity

5000 Sets/Month

Key features

Mobile & Adjustable Design: Wheeled chassis allows easy transport; loading height and conveyor length are fully customizable.
High Capacity Loading: Delivers 30-60 tons per hour, capable of filling silo trucks in 45-60 minutes.
Dust-Free Operation: Built-in dust collector with >99.9% efficiency prevents material loss and ensures safety.
Remote Control Operation: One operator can manage discharging and loading simultaneously via remote controller.
Low Maintenance & Durable: Problem-free design allows long-term operation without frequent maintenance needs.
Versatile Material Handling: Suitable for cement, fly ash, starch, sugar, sand, plastic pellets, and other dry bulk goods.
Adaptable to Uneven Ground: Screw jack leveling legs adjust for any uneven terrain to ensure safe operation.
Energy Efficient: Low energy consumption with variable frequency adjustable screw speed.

Company profile

Shandong Cad Industry Machinery Equipment Co., Ltd.
Importers and ExportersHigh Repeat Buyers ChoiceFast DeliveryLow MOQ
Business Type: Manufacturer/FactoryExport Year: 2023-10-01Nearest Port: QingdaoAverage Response Time: ≤3.10hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA

AI-Powered supplier vetting

SummaryThe supplier is a professional technical supplier involved in pipeline transportation equipment, metal products, building materials, electrical equipment, machinery, and special equipment. It reports CE certification, multiple customization options, 3D software design services, and a stated production capacity of 8,000 cement silo sets. Quality assurance procedures, corrective and preventive action procedures, and complaint-handling procedures are documented with records. However, finished products are checked by packing staff, and the supplier reports no valid manufacturing-capacity contract with related subcontractors, no inventory, no overseas warehouse, no overseas agents or branches, and no offline trade-show participation. Financial information is represented only by years, so financial credibility cannot be assessed. The supplier reports broad export markets and customer coverage but provides no specific customer names or case details.
Supplier typeThe supplier identifies itself as a professional technical supplier and operates in machinery, special equipment, pipeline transportation equipment, metal products, building materials, and related equipment sales and research and development. Its stated scope indicates an industrial equipment and engineering-oriented supplier rather than a general consumer-goods supplier.
CertificationsThe supplier reports CE as its sustainable-development and product-certification capability. No additional certification details, certificate scope, or validity information are provided.
After-Sales capabilityThe supplier states that it has a comprehensive pre-sales and after-sales service system, and it has documented corrective and preventive action and customer-complaint procedures with follow-up records. However, it reports no overseas agents or branches and identifies debugging as its overseas service offering, limiting the evidence of broad local service coverage.
R&D capabilityThe supplier reports professional technical-supplier R&D capability, 3D software design services, and mechanical-equipment research and development. It does not have an available SDK, so the evidence supports conventional industrial design and R&D capability but not SDK-based integration capability.
Production capacityThe supplier reports three production lines and annual cement silo output of 8,000 sets, with a stated quality-control staffing level of 11–20 people and two quality assurance/control inspectors in another record. At the same time, it reports no valid manufacturing-capacity contract with related subcontractors and no in-stock capability, so production capacity is evidenced but fulfillment support has limitations.
Customization capabilityThe supplier explicitly offers customization from samples, customization from designs, full customization, minor customization, and flexible customization, supported by 3D software design services. This provides direct evidence of broad product customization capability.

Product Q&A

Q:Can the loading height be customized?
A:
Yes, the loading height is customizable. The standard range is a maximum of 4.5m and a minimum of 3.3m.
Q:How long does the warranty last?
A:
The product comes with a one-year warranty covering mechanical defects.
Q:Is the machine suitable for uneven ground?
A:
Yes, it features screw jack leveling legs that can be adjusted for any uneven ground to ensure safe operation.
Q:Does the machine require frequent maintenance?
A:
No, it is designed to be problem-free and can work for a long period without any need for maintenance.
Q:What is the lead time for delivery?
A:
During off-peak season, the lead time is within 15 workdays. During peak season, it may exceed 12 months.

Send Inquiry

*To:Shandong Cad Industry Machinery Equipment Co., Ltd.Shandong Cad Industry Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like