SourcingAI
Try for free
Powered by Made-in-China.com
Customized FRP Spray Tower for Industrial Exhaust Gas Treatment
US$900.00-80,000.00
1 Piece

Product profile

Customization

Available

Application Fields

Chemical, Electronic, Food, Medical, New Energy, Petroleum, Pharmaceutical

Certification

ISO

Model NO.

DHFRP

Condition

New

Gas Type

Acidic Gases, Alkaline Gases, and Malodorous Gases

Noise Level

Low

Parts

Sprinkler Systems, Circulating Water Pumps, etc.

Purification Method

Absorption

Purification technology

Absorption

Purpose

Gas Recovery

Product Type

Non-Standard Customized

Structure Type

Single Tower or Multi-Tower Series Configuration

Functional Categories

Scrubbers, Spray Towers, Desulfurization Towers

Inner Wall Features

Smooth and Seamless, Anti-Scaling, Anti-Clogging

Material

Fiberglass Reinforced Plastic (FRP)

Corrosion Resistance

Acid Alkali and Solvent Resistant

Treatment Gas Type

Acid Gas Alkali Gas and Sulfur Gas

Spray System

Multi-Level Spray System

Circulation System

Liquid Recirculation System

Mist Elimination

High Efficiency Demister

Packing Type

Customized Packing Layer

Tower Configuration

Single Tower or Multi-Tower Series

Installation Type

Vertical Floor Mounted Installation

Application Industry

Chemical Electroplating Pharmaceutical New Energy

Transport Package

Standard Export Packing

Specification

Custiomized

Trademark

DAHUA

Origin

China

Key features

Offering scrubbers, spray towers and desulfurization towers for chemical absorption and neutralization, physical dust removal and cooling, and deep removal of sulfur-containing exhaust gases.
Fiberglass and corrosion-resistant resin composite offers high strength and resists acids, alkalis, organic solvents and salt spray, ensuring long service life and low maintenance.
Smooth, seamless inner walls prevent scaling; large-volume liquid storage tanks with large-diameter drain ports prevent clogging.
Available in grass green, gray, white or custom colors; steel supports, inclined ladders, maintenance platforms, guardrails and piping integrated to safety standards for one-stop delivery.
Widely used in electronics, chemical, pharmaceutical, electroplating, metallurgy, wastewater treatment, waste incineration and new energy industries.

Company profile

Business Type: Manufacturer/FactoryExport Year: 2016-09-01Nearest Port: QINGDAO PORTTerms of Payment: T/T, LC, D/PInternational Commercial Terms(Incoterms): FOB, CIF, FCA, EXW, DDP

About Our Factory & Business Background

AddressSoutheast corner, Jinshan St & Yanggan Rd intersection, No. 288 Jinshan St, Xin'an Subdistrict, Anqiu, Weifang, Shandong, China.
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsClosed Cooling Tower, FRP Cooling Tower, FRP Container

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Q1: What is your minimum order quantity (MOQ)? How can I get a price quote? What price terms do you offer?
A:
A1: MOQ: 1 set. Unit price depends on model/specification (heat exchanger/flow rate/inlet/outlet temperature/ambient wet-bulb temperature). Price terms: FOB/EXW/FCA/DDP/CIF (usually Qingdao FOB). Please provide your detailed process parameters, and we will provide a quote as soon as possible.
Q:Q2: What payment methods do you accept? What is the delivery cycle? How do you ship? How long does the shipping take?
A:
A2: Common options: T/T: 30% deposit + 70% before shipment. Other payment methods are negotiable. Typical delivery time: 15-45 working days after receiving the deposit (depending on the equipment model, material, and current production schedule; may be extended during peak season or for special customization). Shipping method: Sea freight (mainly) or arranged according to customer requirements. Shipping time: Usually 20-45 days, depending on your destination port.
Q:Q3:What are the safe packaging, warranty, after-sales services, and post-delivery complaint procedures?
A:
A3: Standard export packaging: reinforced wooden crates/steel frames, lined with foam and waterproof membrane. Large equipment is shipped unpackaged with rainproof cloth and fixed supports to ensure protection against collisions and moisture during sea transport. Warranty period: 12 months or more (from the date of shipment), negotiable. Support services include: online technical support, spare parts supply, and on-site service arrangements when necessary (subject to mutual confirmation).

Send Inquiry

*To:Shandong Dahua New Material Group Co.,Ltd.Shandong Dahua New Material Group Co.,Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Stainless Steel Spray Tower for Industrial Gas Treatment
Made-in-China.com
Advanced Stability Epoxy Coating for Biogas Scrubber Towers
Made-in-China.com