SourcingAI
Try for free
Powered by Made-in-China.com
Best Work Reliability Boiler Economizer Spiral Fin Tubes
US$1,600.00-3,000.00
1 Ton

Product profile

Customization

Available

Certification

ISO, ASME

Customized

Customized

Model NO.

finned tubes

Surface Treatment

Painted

Fuel

Coal

Range of Applications

Power station, Industrial

Type

Pressure Parts

Name

China Heat Exchanger Spiral Embedded Finned Tubes

Classification

Finned Tube, Spiral Tube

Function

Heat Exchanger

Application

Boiler System

Material

Carbon Steel, Alloy Steel or Equivalent

Lead Time

30-60 Days

Transport Package

Seaworthy Packing

Specification

Customized size

Trademark

HTEG

Origin

Shandong, China

HS Code

8402119000

Production Capacity

200 Tons/Month

Key features

ISO and ASME Certified: Conforms to ISO 9001, ISO 14001, and ASME standards for quality and safety.
Customized Design: Available in customized specifications including material, dimensions, and structure.
High Heat Transfer Efficiency: Spiral fin design enlarges heat exchange area for improved thermal performance.
Abrasion Resistant: Specially designed to overcome serious abrasion and extend service life.
Modular Structure: Can be designed into multiple modules to ensure long-term stable operation.
Remote Control Capability: Compatible with DCS systems for automated and remote computer control.
Compact and Leak-Proof: Compact structure design minimizes leakage risks and saves space.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2009-08-10 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤6.55h CertifiedTerms of Payment: LC, T/T, D/P

AI-Powered supplier vetting

SummaryGaomi Kunbo Thermal Power Engineering Co., Ltd. is identified as a Chinese limited-company factory in Shandong, established in 2003, with approximately 800 employees and three production lines. The supplier specializes in boilers, boiler parts, heat exchangers, air preheaters, economizers, and energy-saving transformation solutions. It reports Grade A boiler manufacturing, A2 pressure-vessel manufacturing, and Grade 1 boiler-installation qualifications, together with ISO9001:2008, ISO14001:2004, and OHSAS18001:2007 certifications. Evidence indicates substantial manufacturing infrastructure, R&D resources, international exports, and stated delivery capability. However, the provided records contain inconsistent company identities and operating figures, including differences in legal name, employee count, registered capital, factory area, and establishment history. After-sales capability, customization capability, and detailed customer references are not sufficiently documented.
Supplier typeThe supplier is described as a limited company and factory based in Gaomi, Shandong, China, operating in manufacturing and industrial equipment. Its stated product scope covers complete boilers, boiler components, air preheaters, economizers, and refractory or insulation materials. However, the records identify different company names, including Gaomi Kunbo Thermal Power Engineering Co., Ltd. and Shandong Hengtao Energy-Saving Environmental Protection Co., Ltd., so the exact legal identity requires verification.
CertificationsThe supplier is explicitly reported to hold Grade A boiler-manufacturing, A2 pressure-vessel-manufacturing, and Grade 1 boiler-installation qualifications. It also lists ISO9001:2008, ISO14001:2004, and OHSAS18001:2007 certificates, as well as multiple qualifications and certifications in the company background. The records do not provide certificate numbers, validity dates, or issuing bodies.
R&D capabilityThe supplier is described as a national high-tech enterprise specializing in R&D for boilers, boiler parts, efficient heat exchangers, heat-transfer components, and energy-saving transformation. It reports 55 years of total R&D-engineer experience and claims a leading position in enamel air-preheater R&D and manufacturing, providing explicit evidence of technical development capability.
Production capacityProduction capability is supported by approximately 800 employees, three production lines, a reported manufacturing area of 62,800 square meters, and stated output of 1,000 boiler and boiler-part sets annually. The supplier also reports one-month lead times in both off-peak and peak seasons. Some operating figures differ from another company description, which should be reconciled during verification.
Client casesThe supplier states that projects involving such manufacturers have resulted in exports to Thailand, Vietnam, India, Indonesia, and other countries or regions. This provides evidence of international project experience, but the records do not identify customer names, project scopes, dates, quantities, performance outcomes, or verifiable references.

Product Q&A

Q:What certifications does the product have?
A:
The product conforms to ISO 9001, ISO 14001, and ASME standards.
Q:Is the product customizable?
A:
Yes, the product is fully customized, including material (Carbon Steel, Alloy Steel), dimensions, and structure.
Q:What is the lead time for production?
A:
The standard lead time is 30-60 days, with peak and off-peak seasons both requiring approximately one month.
Q:What are the technical specifications for the fin tubes?
A:
Base tube OD ranges from 25-159mm, wall thickness 2-8mm, fin thickness 0.8-2mm, and fin height 10-30mm.
Q:Can the system be controlled remotely?
A:
Yes, the existing boiler DCS system can be changed to achieve automatic and remote control via computer.

Send Inquiry

*To:Gaomi Kunbo Thermal Power Engineering Co., Ltd.Gaomi Kunbo Thermal Power Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Competitive Price Stainless Steel Boiler Spiral Fin Tube
Made-in-China.com