Powered by Made-in-China.com

CFB Series Energy Saving Boiler Air Preheater
US$100,000.00
1 Set
Product profile
Customization
AvailableCertification
ISOCustomized
CustomizedModel NO.
CustomizedSurface Treatment
PaintedFuel
CoalRange of Applications
Power station, IndustrialType
Boiler Air PreheaterProduct Name
CFB Series Energy Saving Boiler Air PreheaterMaterial
Carbon SteelAvailbale
Energy SavingApplication
Boiler SystemWarranty
1 YearTransport Package
Seaworthy PackageSpecification
CustomizedTrademark
HTEGOrigin
China(Mainland)HS Code
8402119000Production Capacity
500 Tons/MonthKey features
Energy Saving Design: Uses boiler tail flue smoke to heat entering air, improving thermal efficiency and reducing energy consumption.
Anti-Corrosion Enamel Tubes: Enamel steel tubes feature anti-abrasion and anti-corrosion properties with smooth surfaces and low maintenance costs.
Comprehensive Quality Inspection: Includes 100% NDT reports, 100% X-ray inspection of welding seams, and hydraulic test reports for safety.
1 Year Warranty Coverage: Provides a 1-year warranty for the boiler air preheater to ensure product reliability.
Customized Manufacturing: Offers customized boiler parts including enameled tubular air preheaters and economizers.
Experienced Engineering Team: Engineers with over 20 years of experience in designing and manufacturing boiler systems.
ISO Certified Quality: Product meets ISO certification standards for quality and safety.
Versatile Material Options: Available in carbon steel, corten steel, or equivalent materials to suit specific needs.
Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2009-08-10 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h CertifiedTerms of Payment: LC, T/T, D/P
AI-Powered supplier vetting
SummaryGaomi Kunbo Thermal Power Engineering Co., Ltd. is identified as a Chinese limited-company factory in Shandong, established in 2003, with approximately 800 employees and three production lines. The supplier specializes in boilers, boiler parts, heat exchangers, air preheaters, economizers, and energy-saving transformation solutions. It reports Grade A boiler manufacturing, A2 pressure-vessel manufacturing, and Grade 1 boiler-installation qualifications, together with ISO9001:2008, ISO14001:2004, and OHSAS18001:2007 certifications. Evidence indicates substantial manufacturing infrastructure, R&D resources, international exports, and stated delivery capability. However, the provided records contain inconsistent company identities and operating figures, including differences in legal name, employee count, registered capital, factory area, and establishment history. After-sales capability, customization capability, and detailed customer references are not sufficiently documented.
Supplier typeThe supplier is described as a limited company and factory based in Gaomi, Shandong, China, operating in manufacturing and industrial equipment. Its stated product scope covers complete boilers, boiler components, air preheaters, economizers, and refractory or insulation materials. However, the records identify different company names, including Gaomi Kunbo Thermal Power Engineering Co., Ltd. and Shandong Hengtao Energy-Saving Environmental Protection Co., Ltd., so the exact legal identity requires verification.
CertificationsThe supplier is explicitly reported to hold Grade A boiler-manufacturing, A2 pressure-vessel-manufacturing, and Grade 1 boiler-installation qualifications. It also lists ISO9001:2008, ISO14001:2004, and OHSAS18001:2007 certificates, as well as multiple qualifications and certifications in the company background. The records do not provide certificate numbers, validity dates, or issuing bodies.
R&D capabilityThe supplier is described as a national high-tech enterprise specializing in R&D for boilers, boiler parts, efficient heat exchangers, heat-transfer components, and energy-saving transformation. It reports 55 years of total R&D-engineer experience and claims a leading position in enamel air-preheater R&D and manufacturing, providing explicit evidence of technical development capability.
Production capacityProduction capability is supported by approximately 800 employees, three production lines, a reported manufacturing area of 62,800 square meters, and stated output of 1,000 boiler and boiler-part sets annually. The supplier also reports one-month lead times in both off-peak and peak seasons. Some operating figures differ from another company description, which should be reconciled during verification.
Client casesThe supplier states that projects involving such manufacturers have resulted in exports to Thailand, Vietnam, India, Indonesia, and other countries or regions. This provides evidence of international project experience, but the records do not identify customer names, project scopes, dates, quantities, performance outcomes, or verifiable references.
Product Q&A
Q:Which port is closest to your location?
A:
Qingdao Port is closest to our factory, about 1 hour driving distance to our place.
Q:How about your delivery time?
A:
Generally, it will take 30-45 day after receiving your advance payemnt. The specific delivery time depends on the items and the quantity of your order.
Q:Do you offer overseas installation service?
A:
Yes, we provide overseas installation service for our boiler systems.
Q:What materials are used for the air preheater?
A:
The air preheater is manufactured using carbon steel, corten steel, or equivalent materials.
Q:What is the warranty period for the product?
A:
We provide a 1-year warranty for the CFB series energy saving boiler air preheater.
Send Inquiry
*To:
Gaomi Kunbo Thermal Power Engineering Co., Ltd.
Gaomi Kunbo Thermal Power Engineering Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Energy Saving Rotary Air Preheater for Power Plant Boiler
US$100,000.00-500,000.00
1 Set(MOQ)
Energy-Saving Carbon Alloy Steel Air Preheater for Boilers
US$300.00-30,000.00
1 Set(MOQ)
High Efficiency and Energy Saving Boiler Part Air Preheater
US$1,400.00-1,500.00
1 Ton(MOQ)
Energy Saving Boiler Enameled Air Preheater with China Brand ASME Standard
US$1,550.00
1 Ton(MOQ)
Boiler Air Preheaters for Energy Saving
US$1,000.00-1,800.00
1 Ton(MOQ)
China Supplier Boiler Energy Saving Transformation Parts Air Preheater
US$100,000.00
1 Set(MOQ)
Carbon Steel Power Plant Boiler Air Preheater with Energy Saving
US$3,000.00-6,000.00
1 Ton(MOQ)
Datang High Thermal Efficiency Recovered Energy and Cost Savings Fin Tube Air Preheater
US$300.00-30,000.00
1 Set(MOQ)
High Efficiency Finned Tube Air Preheater for Energy Savings
US$100.00-135.00
1 Set(MOQ)
Custom Boiler Air Preheater for Energy Efficiency, Designed for Large-Scale Industrial Boilers
US$1,550.00-30,000.00
1 Piece(MOQ)
Saving Energy Air Preheater Combined with Heating Furnace
US$2,800.00-4,000.00
1 Ton(MOQ)
Industrial Waste Heat Recovery Boiler Preheater, Maximizes Energy Utilization and Savings
US$1,550.00-30,000.00
1 Piece(MOQ)
High-Efficiency Boiler Flue Gas Preheater for Energy Savings
US$243.00-245,000.00
1 Piece(MOQ)
Improving Thermal Efficiency Flue Gas Heat Exchanger for CFB Boiler Air Preheater
US$4,500.00-6,000.00
1 Ton(MOQ)
Enamel Tube Air Preheater OEM Customized for CFB Boiler Waste Incinerator
US$1,550.00-30,000.00
1 Piece(MOQ)
Energy Saving Power Station Biogass Fired Boiler Accessory Boiler Air Preheater
US$4,500.00-5,000.00
20 Tons(MOQ)
Energy-Saving Waste Incineration Plant Waste Heat Recovery System Stainless Steel Welded Plate Type Air Preheater
US$1,000.00-250,000.00
1 Set(MOQ)
Eco-Friendly Low Nox Air Preheater for Energy Efficiency
US$39.00-245,000.00
1 Piece(MOQ)
Economizer Integrated Air Preheater Dual Function 30% Fuel Saving
US$113.00-245,000.00
1 Piece(MOQ)



















