SourcingAI
Try for free
Powered by Made-in-China.com
CFB Series Energy Saving Saving Boiler Spare Parts Air Heating Elements
US$1,600.00
1 Ton

Product profile

Customization

Available

Certification

ISO, TUV

Customized

Customized

Model NO.

customized

Surface Treatment

Enamel Coated

Fuel

Coal

Range of Applications

Power station, Industrial

Type

Heat Exchanger

Name

CFB Series Energy Saving Saving Boiler Spare Parts

Size

Customized

Color

Customized

Delivery Time

Within 30 Days

Brand

Hteg

Category

Cold and Hot End

Material

Carbon Steel,Corten Steel

Standard

ASME

Certificate

ISO,TUV,BV

Transport Package

Seaworthy Packing

Specification

Customized

Trademark

HTEG

Origin

China

HS Code

8402119000

Production Capacity

500 Tons/Month

Key features

Customized Design: Size and color are fully customizable to meet specific operational requirements.
Enamel Coating: Resistant to abrasion, corrosion, hard fouling, and gas resistance for severe conditions.
Fast Delivery: Lead time within 30 days after deposit or L/C; samples shipped within 1 week if in stock.
Global Export Experience: Exported boilers and services to over 50 countries with advanced German and Italian technology.
ISO and TUV Certified: Product meets international standards including ISO, TUV, and BV certifications.
Low MOQ: Minimum order quantity is just 1 set, accommodating small sample orders.
OEM and ODM Services: Full OEM and ODM services available with 55 R&D engineers supporting development.
Rapid Response Support: Dedicated team provides feedback within 12 hours for all customer inquiries.

Company profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2009-08-10 CertifiedNearest Port: Qingdao PortAverage Response Time: ≤15h CertifiedTerms of Payment: LC, T/T, D/P

AI-Powered supplier vetting

SummaryGaomi Kunbo Thermal Power Engineering Co., Ltd. is identified as a Chinese limited-company factory in Shandong, established in 2003, with approximately 800 employees and three production lines. The supplier specializes in boilers, boiler parts, heat exchangers, air preheaters, economizers, and energy-saving transformation solutions. It reports Grade A boiler manufacturing, A2 pressure-vessel manufacturing, and Grade 1 boiler-installation qualifications, together with ISO9001:2008, ISO14001:2004, and OHSAS18001:2007 certifications. Evidence indicates substantial manufacturing infrastructure, R&D resources, international exports, and stated delivery capability. However, the provided records contain inconsistent company identities and operating figures, including differences in legal name, employee count, registered capital, factory area, and establishment history. After-sales capability, customization capability, and detailed customer references are not sufficiently documented.
Supplier typeThe supplier is described as a limited company and factory based in Gaomi, Shandong, China, operating in manufacturing and industrial equipment. Its stated product scope covers complete boilers, boiler components, air preheaters, economizers, and refractory or insulation materials. However, the records identify different company names, including Gaomi Kunbo Thermal Power Engineering Co., Ltd. and Shandong Hengtao Energy-Saving Environmental Protection Co., Ltd., so the exact legal identity requires verification.
CertificationsThe supplier is explicitly reported to hold Grade A boiler-manufacturing, A2 pressure-vessel-manufacturing, and Grade 1 boiler-installation qualifications. It also lists ISO9001:2008, ISO14001:2004, and OHSAS18001:2007 certificates, as well as multiple qualifications and certifications in the company background. The records do not provide certificate numbers, validity dates, or issuing bodies.
R&D capabilityThe supplier is described as a national high-tech enterprise specializing in R&D for boilers, boiler parts, efficient heat exchangers, heat-transfer components, and energy-saving transformation. It reports 55 years of total R&D-engineer experience and claims a leading position in enamel air-preheater R&D and manufacturing, providing explicit evidence of technical development capability.
Production capacityProduction capability is supported by approximately 800 employees, three production lines, a reported manufacturing area of 62,800 square meters, and stated output of 1,000 boiler and boiler-part sets annually. The supplier also reports one-month lead times in both off-peak and peak seasons. Some operating figures differ from another company description, which should be reconciled during verification.
Client casesThe supplier states that projects involving such manufacturers have resulted in exports to Thailand, Vietnam, India, Indonesia, and other countries or regions. This provides evidence of international project experience, but the records do not identify customer names, project scopes, dates, quantities, performance outcomes, or verifiable references.

Product Q&A

Q:Are you a manufacturer or a trading company?
A:
We are a manufacturer and we have our own trade company.
Q:What is the delivery time?
A:
Commonly the lead time will be within 30 days after receiving 30% deposit or L/C, subject to prior sales.
Q:What is the minimum order quantity?
A:
1 set. The sample order, if we have stocks, we will send out the products within 1 week.
Q:What are the advantages of your company?
A:
We have exported our boilers and service to more than 50 countries. We have a specialized team work for you, you will get our feedback within 12 hours. We use Germany and Italian advanced manufacturing technology.

Send Inquiry

*To:Gaomi Kunbo Thermal Power Engineering Co., Ltd.Gaomi Kunbo Thermal Power Engineering Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Waste Oil Burner/Waste Oil Burner for Sale
Made-in-China.com
Waste Oil Dirty Oil Heavy Oil Modulation Burner
Made-in-China.com
Diesel Oil Burner for Drying Machine
Made-in-China.com