SourcingAI
Try for free
Powered by Made-in-China.com
High-Efficiency Low Heat Loss Plastic Jacketed Pipe for Heat Pumps
US$4.56-486.00
100 Meters
Sample price:US$9.09/meter.Request sample

Product profile

Customization

Available

Application

Chemical Industry, Construction Industry, Oil and Gas Industry, Water Treatment Plants

End Connection

Plain End

Model NO.

DN15-1200

Length

Custom Length

Outer Diameter

Customizable

Wall Thickness

Customizable

Type

Insulation Pipe

Material

Carbon Steel

Colour

Customisable

Transport

Sea Freight

Compliance Standard

GB/T8163-2018-20#

Structure

Integral

Durability

High

Construction

Prefabricated

Transport Package

Standard Packaging

Specification

DN15-1200

Trademark

JLL

Origin

China

Production Capacity

200000 Ton Per Year

Key features

Energy Saving Efficiency: Reduces heat loss in heating pipelines by over 30%, significantly lowering operating costs.
Superior Waterproof Performance: HDPE outer pipe prevents groundwater and corrosive media from invading the insulation layer.
Long Service Life: Designed for 30 to 50 years of service under correct operating conditions.
Factory Prefabrication: Ensures stable quality and reduces on-site construction time and volume.
Flame Retardant: Meets fire protection requirements through added flame retardants.
Customizable Color: Color options are available to meet specific customer requirements.

Company profile

Golden Blue Collar (Shandong) International Trade Co., Ltd
Importers and ExportersHigh Repeat Buyers ChoiceFast DeliveryR&D Capabilities
CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.04h CertifiedTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressJinan, Shandong, China
Plant Area1000 square meters
Number of Employees14
Registered Capital30,000,000 RMB
International Commercial Terms(Incoterms)FOB, CFR, CIF, EXW
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: one month
Minimum Order Quantity1 ton
Supply Chain Partners3

Our Production Capability & Technical Expertise

Main ProductsPolyurethane, Mdi Polyurethane, Polyurethane Foaming Agent, Isocyanate, Polyurethane Composite Material, Polyurethane Black and White Material, Corrosion-Resistant Pipe, Polyurethane Pipes
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Repeat Buyers Choice80%~100%
Number of Foreign Trading Staff4
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Product Q&A

Q:What is your main product?
A:
1.Polyurethane foaming agent 2.Polyurethane insulation pipe 3.3PE anti-corrosion pipe
Q:What is the MOQ?
A:
1.Sample charge should prepaid. 2.Insulation pipe: Minimum order quantity is 100 meters.
Q:How we can pay for?
A:
Payment of the deposit, and the balance payment to be made before shipment. Our shipping terms is FOB, CIF.
Q:How about the delivery time?
A:
1.Polyurethane insulation pipe: About 10-12 working days per kilometer of polyurethane insulation pipe. It is up to the quantity. 2.Polyurethane foaming agent: About 3-7 working day for mass products production time. It is up to the quantity

Send Inquiry

*To:Golden Blue Collar (Shandong) International Trade Co., LtdGolden Blue Collar (Shandong) International Trade Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Schedule 40 Seamless Pipes En10216 for Chilled Water
Made-in-China.com
ASTM A106 Seamless Steel Pipe for Oil and Gas Line
Made-in-China.com