Powered by Made-in-China.com
High-Quality Mild Carbon Steel Square Tube for Construction
US$600.00
25-99 Tons
US$560.00
100-299 Tons
US$520.00
300-499 Tons
US$480.00
500+ Tons
Product specifications
OD
Product profile
Customization
AvailableAfter-sales Service
24-Hour ServiceWarranty
5 YearModel NO.
10#, 20#, 45#, Q235B, Q345B etcType
WeldedTechnique
ERWMaterial
Carbon SteelSurface Treatment
BlackUsage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special PurposeSection Shape
SquareCertificate
CE, RoHS, ISO 9001Tolerance
±1%Processing Service
Welding, Punching, Cutting, Bending, DecoilingDelivery Time
8 ~ 14 DaysMaterial Grade
10 #, 20 #, 45#, Q345b, Q355b, 20cr, 40crDiameter
6mm-1800mmWall Thickness
1.0mm~50mmLength
6m-12m or CustomizedApplication
Construction Building MaterialKeyword
Mill Test Certificate Steel PipeSample
ProvideMOQ
25 TonsInvoicing
by Actual WeightTransport Package
Standard Export Seaworthy PackingSpecification
CustomizableTrademark
JYSTEELOrigin
Shandong, ChinaHS Code
7306309000Production Capacity
50000tons/YearKey features
High-Quality Carbon Steel: Durable and suitable for various industrial applications.
CE Certified: Ensures safety and reliability for use in construction and building projects.
Non-Oiled Finish: Ideal for fluid and gas pipelines requiring minimal maintenance.
Customizable Lengths: Available in 6m and 12m options for flexible installation.
Efficient Processing: Includes services like welding, cutting, and bending for seamless project integration.
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Flexible customization CertifiedExport Year: 2 years CertifiedNearest Port: TianjinAverage Response Time: ≤0.36h
About Our Factory & Business Background
AddressNorth End of Laoshan Road, Development Zone, Liaocheng, Shandong, China
Plant Area15000 square meters
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity25 tons
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsSeamless Steel Pipe, Galvanized Steel Pipe, Copper Pipe, Roofing Sheet, Aluminum Coil, Square Tube, Galvanized Steel Coil, Prepainted Steel Coil
Production Lines2
Production MachinesSeamless steel pipe production line, Sawing machine, Precision saw
QA/QC inspectors2 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2012-01-05
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Product CertificationOthers
Cooperated with Fortune 500No
Product Q&A
Q:How do you guarantee the quality?
A:
1.We have passed ISO9001,CE and other certifications.
2.Always have pre-production samples before mass production,and always do finalinspection before shipment.
3. Acceptable third-party inspection.
Q:About the product price?
A:
Due to the cyclical changes in raw material prices, prices vary from period to period. You can consult us, you can communicate with us online through the platform, WeChat, WhatsApp and other platforms, and we will reply within 24 hours. Please give us your requirements and specifications (steel grade, size, quantity, destination port), and we will work out the best price at the first time.
Q:Can I visit your factory?
A:
Of course, we welcome customers from all over the world to visit our factory. However, some factories are not open to the public.
Q:How about the samples ? is it free or extra fees?
A:
Yes, we would like to supply the samples before order; if the samples from stock, it will be free; if the samples from new production, we will charge some reasonable cost, but this amount will be deducted from your first order invoice.
Q:How long is your delivery time?
A:
Generally speaking, our delivery time is within 15-45 days, if the demand is particularly large or there are special circumstances, the delivery time may be delayed.
Send Inquiry
*To:
Shandong Liaocheng Jiuyang Steel Pipe Manufacturing Co., Ltd
Shandong Liaocheng Jiuyang Steel Pipe Manufacturing Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
High-Quality En10216-2 P235gh SA210 A1/C Seamless Carbon Steel Tube for Boilers
US$500.00-700.00
1 Ton(MOQ)
High-Quality Carbon Steel Seamless Tube for Boilers and Drilling
US$590.00-690.00
1 Ton(MOQ)
High-Quality ERW Steel Tube for Industrial Use, 20-920mm
US$575.00-580.00
10 Tons(MOQ)
High-Quality Welded Steel Tubes for Durable Structural Applications
US$575.00-580.00
10 Tons(MOQ)
ASTM A500 Grade B Carbon Steel Square Tube 200X200X8mm for Building Structure
US$398.00-416.00
5 Tons(MOQ)
Premium Galvanized Carbon Steel Square Tube for Hydraulic Applications
US$350.00-500.00
5 Tons(MOQ)
High Quality Round Steel Pipe Fittings Galvanized Pipe Tube for Construction Project
US$369.00-528.00
1 Ton(MOQ)
Premium Pre-Galvanized Square Steel Tubes for Durable Construction
US$520.00-590.00
20 Tons(MOQ)
Hot Rolled Carbon Steel Structural Shs Rhs Square Rectangular Tube for Bridge
US$480.00-600.00
25 Tons(MOQ)
Mild Steel Rectangular Square Hollow Section Square Steel Tube Used in Construction
US$666.00-1,000.00
20 Tons(MOQ)
Thin Wall ERW Carbon Steel Tube for General Construction
US$530.00-550.00
28 Tons(MOQ)
Iron and Steel Hollow Section Mild Square Tube 50X50mm Square Steel Pipe Carbon Steel Square Rectange Tube
US$688.00-1,022.00
20 Tons(MOQ)



















