Powered by Made-in-China.com
Polyurethane Insulated Spiral Steel Pipe for District Heating Project
US$580.00-650.00
25 Tons
Product specifications
OD
WT
Product profile
Customization
AvailableAfter-sales Service
24-Hour ServiceWarranty
5yearsModel NO.
A106 A53 10#, 20#, 45#, Q235B, Q345B etcType
WeldedTechnique
SAWMaterial
Carbon SteelSurface Treatment
BlackUsage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special PurposeSection Shape
RoundStandard
GB ASTM JIS En EctCertification
SGS, ISO9001Od
15-3620mmWt
2-80mmLength
6000mm 9000mm 12000mmm or CustomizedGrade
Q235B Q355b Q355D S235jr S275jr A53 St37Process
ERW LSAW SSAWSurface
Naked Black PaintedPacking
Steel Strapping, Film Wrapping and Bracket FixingProcessing Service
Standard Sea Worthy PackageTransport Package
Standard Export Shipping PackagingSpecification
CustomizedTrademark
JYSTEELOrigin
ShangdongProduction Capacity
200000tons/YearKey features
Uniform welds, stable pressure resistance and low leakage risk
Precise dimensions and tight wall thickness tolerance
The material meets standards with high strength of Q235B/Q355B
Available for galvanizing / painting, rust-proof and durable
Customizable lengths, suitable for engineering projects, supports and fences
Direct supply from factory, fast delivery and high cost performance
Large-diameter integral forming, suitable for water supply, drainage and pile foundation projects
Spiral welds feature good toughness and deformation resistance
Anti-corrosion coating optional, long service life for underground burial
High toughness and bending resistance, suitable for various steel structure construction projects
Company profile
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Flexible customization CertifiedExport Year: 2 years CertifiedNearest Port: TianjinAverage Response Time: ≤0.61h
About Our Factory & Business Background
AddressNorth End of Laoshan Road, Development Zone, Liaocheng, Shandong, China
Plant Area15000 square meters
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, D/P, PayPal, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity25 tons
Supply Chain Partners5
Our Production Capability & Technical Expertise
Main ProductsSeamless Steel Pipe, Galvanized Steel Pipe, Copper Pipe, Roofing Sheet, Aluminum Coil, Square Tube, Galvanized Steel Coil, Prepainted Steel Coil
Production Lines2
Production MachinesSeamless steel pipe production line, Sawing machine, Precision saw
QA/QC inspectors2 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers2 people
Traceability of Raw MaterialsYes
Our Industry Experience & Global Business Record
Year of Establishment2012-01-05
Main MarketsSouth America, Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea), Domestic
Repeat Buyers Choice50%~80%
Number of Foreign Trading Staff5
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Our Certifications, Standards & Industry Recognition
Management System CertificationISO9001:2015
Product CertificationOthers
Cooperated with Fortune 500No
Product Q&A
Q:How about the MOQ? If my first order qty is small, will you accept?
A:
We would like to do our best to support your trial order qty, so even 1 pc or 1 kg is ok to start cooperation; because we have confidence to move on second order with your esteemed company.
Q:What is your payment terms ?
A:
Commonly two payment term for new customers:1) 30% T/T as deposit , 70% balance against B/L copy; 2) 100% Irrevocable L/C at sight;If you need any other terms, pls feel free to contact us too, we will try our best.
Q:How long is your delivery time?
A:
Our daily inventory is more than 8000 tons, so for common product size, just need 5 days from stocks; if the special size from new production, delivery 7 days.
Q:How about the samples ? is it free or extra fees?
A:
Yes, we would like to supply the samples before order; if the samples from stock, it will be free; if the samples from newproduction, we will charge some reasonable cost, but this amount will be deducted from your first order invoice.
Q:How to control and guarantee your shipment quality?
A:
1) All our factories are ISO9001, CEcertified facility; 2) Ex factory inspection by our own laboratory.
Send Inquiry
*To:
Shandong Liaocheng Jiuyang Steel Pipe Manufacturing Co., Ltd
Shandong Liaocheng Jiuyang Steel Pipe Manufacturing Co., Ltd*Content:
Supplier replies will be sent to your registered email
You may also like
Pre-Insulated S355mc Steel Pipe for District Heating with HDPE Outer Jacket
US$600.00
1 Ton(MOQ)
Large Diameter SSAW Spiral Steel Pipe for Water Pipeline Project
US$480.00-600.00
25 Tons(MOQ)
Large Diameter Spiral Welded Steel Pipe for Water Supply Project
US$480.00-600.00
25 Tons(MOQ)
Large Diameter Spiral Welded Carbon Steel Pipe for Pipeline Project
US$510.00-550.00
1 Ton(MOQ)
Spiral Welded Steel Pipe SSAW for Piling Foundation Project
US$580.00-650.00
25 Tons(MOQ)
20 Inch Large Diameter Thin Wall Spiral Welded Steel Pipe Penstock Steel Pipe for Drilling Projects
US$600.00-750.00
1 Ton(MOQ)
Durable Spiral Steel Pipe for Industrial Applications and Construction Projects
US$500.00-650.00
1 Ton(MOQ)
High-Quality SSAW Spiral Welded Steel Pipe for Construction Projects
US$899.00-900.00
10 Tons(MOQ)
Seamless Steel Pipe for Geothermal Heating Projects with Anti-Corrosion and Thermal Insulation Layer
US$700.00-1,200.00
1 Ton(MOQ)
Durable Welded Carbon Steel Pipe, Large Diameter Pipe ERW Spiral Pipe for Construction & Pipeline Projects
US$460.00-510.00
5 Tons(MOQ)
Heavy-Duty Spiral Welded Steel Pipe for Large Projects
US$458.00-496.00
1 Ton(MOQ)



















