SourcingAI
Try for free
Powered by Made-in-China.com
Drilling Rig F1300 Mud Pump Spare Parts Clamp Assembly
US$45.00
1 Piece
Sample price:US$60.00/piece.Request sample

Product profile

Customization

Available

Type

Clamp Assembly

Name

Clamp Assembly

Model NO.

clamp assembly

Usage

Drill Rig

Condition

New

Material

Zg35crmo

Dimension

300*205*103mm

Packing

Standard Wooden Case

Surface

Forging

Transport Package

Standard Case

Specification

300*205*103

Trademark

SEACO

Origin

China

Key features

High-Strength Material: Forged from ZG 35CrMo alloy steel for durability.
Precision Machining: Tight tolerances ensure proper fit and alignment.
Complete Hardware: All clamps furnished with required hardware.
Wide Compatibility: Fits BOMCO, National, Oilwell, and Russian pump brands.
Quality Inspection: Spot and finished product inspection on production line.
Defect Replacement: Replacement or credit provided for defective items.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2013-01-01Nearest Port: Qingdao, Tianjin, shanghaiAverage Response Time: ≤2.61hTerms of Payment: LC, T/T, PayPal, etc.International Commercial Terms(Incoterms): FOB, EXW, CIF, DDP, CIP, FCA

About Our Factory & Business Background

AddressNo. 333 Liuyanghe Road Dongying City China
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsOil Equipment, Drilling Tool, Rig, Wellhead Equipment, Steel Tubing Casing, Drill Pipe, Oil Extraction Machinery and Accessories, Valves and Fittings, Marine Spare Parts

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:How can I place an order?
A:
You can contact us by email about your order details, or place order on line.
Q:How can I pay you?
A:
After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
Q:What is the order procedure?
A:
First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for yo
Q:How do you handle defective products?
A:
Replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
Q:How do you check goods in the production line?
A:
We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

Send Inquiry

*To:Shandong Seaco Machinery Equipment Co., Ltd.Shandong Seaco Machinery Equipment Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like