Powered by Made-in-China.com
Fixed Formwork Expanded Polystyrene Formwork for Construction
US$30.00
100-559 Pieces
US$25.00
560-1,259 Pieces
US$22.00
1,260+ Pieces
Sample price:US$35.00/piece.Request sample
Product profile
Customization
AvailableAfter-sales Service
2 YearsWarranty
2 YearsModel NO.
BZ-PPType
FlatMaterial
PPApplication
Functional ComponentsMaterial Properties
Flame RetardantMarkets Served
Building & ConstructionCustomized
CustomizedColor
Multi ColorSurface Finishing
FinishedCertification
ISOThickness
12-20mmFeature
Durable and WaterproofReusable Time
More Than 50 TimesAdvantage
No Need OilTransport Package
PalletSpecification
2440*1220mm/1830*915mmTrademark
BeizhuOrigin
ChinaHS Code
3925900000Production Capacity
1000 PCS/DayKey features
Durable and Waterproof: Flame retardant, no moisture absorption, no deformation, suitable for damp environments.
High Reusability: Can be reused more than 50 times, significantly reducing project costs compared to wood.
Lightweight and High Strength: High hardness and impact resistance, easy to carry without requiring a crane.
No Release Agent Required: Demoulds easily by tapping only, saving time and preventing concrete surface pollution.
Customizable Size and Color: Available in multi-color options and customizable thickness from 12-20mm.
Easy to Process: Can be sawed, drilled, and nailed, compatible with other construction materials.
Eco-Friendly Material: Made from recycled PP, energy-saving, and produces no toxic gases.
ISO Certified Quality: Manufactured by a factory with ISO9001:2008 certification since 2008.
Company profile

CertifiedBusiness Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 3 years CertifiedNearest Port: Qingdao PortAverage Response Time: ≤2.78h
About Our Factory & Business Background
Address02-101, Building 72, Yangguang Lansheng, South Renmin Road, Xiaodian District, Taiyuan, Shanxi, China
Plant Area82.52 square meters
Number of Employees13
Registered Capital5,000,000 RMB
Terms of PaymentLC, T/T, D/P, Western Union, PayPal
International Commercial Terms(Incoterms)FOB, CIF, CFR, EXW
Average Lead TimePeak Season Lead Time: within 15 workdays, one month Off Season Lead Time: within 15 workdays
Minimum Order Quantity1
Supply Chain Partners3
Our Production Capability & Technical Expertise
Main ProductsPrinting Paper, PE Coated Paper, Stone Paper, Plastic Formwork, Concrete Formwork, PP Hollow Plastic Formwork, PVC Formwork, PVC Foam Board, Plastic H20 Beam, Column Formwork, Steel Props, Scaffolding
QA/QC inspectors2 people
Inspection Type for Finished ProductsRandom inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsFinished product checked by packing staff
R&D Engineers3 people
Traceability of Raw MaterialsYes
Own BrandYes
Our Industry Experience & Global Business Record
Year of Establishment2022-09-19
Main MarketsSoutheast Asia/ Mideast, Africa
Number of Foreign Trading Staff9
Overseas Agent/BranchNo
New Products Launched in Last yearYes
Product Q&A
Q:Are you a factory or trading company?
A:
Factory.
Q:How can I get the sample?
A:
We provide sample free of charge 3-7 work days.
Q:What payment terms do you do?
A:
30% T/T as down payment, the balance paid by T/T before shipment or 100% irrevocable L/C At sight.
Q:What is your MOQ for Beizhu concrete formwork?
A:
We have some stock for normal size, so it depends on your requirement.
Q:How long is your delivery time?
A:
10-15 work days.
Send Inquiry
*To:
Shanxi SUFENG New Material Technology Co., Ltd.
Shanxi SUFENG New Material Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Concrete Forming Systems Fence Fixed Formwork Expanded Polystyrene
US$20.00-25.00
560 Pieces(MOQ)
Durable Plastic Construction Formwork System for Easy Assembly
US$20.00-55.00
200 PCS(MOQ)
Beizhu Formwork Manufaturing for Concrete Construction
US$22.00-29.00
400 Pieces(MOQ)
Versatile PVC Insulated Formwork for Efficient Permanent Wall Construction
US$35.00
600 Sets(MOQ)
Concrete Formwork for Construction & Real Estate
US$22.00-29.00
100 Pieces(MOQ)
Affordable Plastic Formwork Solutions for Concrete Construction Projects
US$20.00-55.00
200 PCS(MOQ)
Reusable Plastic Construction Formwork for Concrete Wall Construction Cheap
US$20.00-55.00
200 PCS(MOQ)
PVC Formwork Foldable Panel Profiles for Permanent Construction Concrete Wall
US$1,150.00-1,170.00
10 Tons(MOQ)
High-Quality Plastic Formwork for Large Scale Construction Projects
US$20.00-55.00
200 PCS(MOQ)
PP Hollow Plastic Concrete Formwork for Construction
US$22.00-29.00
100 Pieces(MOQ)
Construction Materials PP Hollow Wall Formwork for Concrete
US$23.20-25.00
100 Pieces(MOQ)
Advanced PVC Formwork for Permanent Wall Construction and Insulation
US$1,150.00-1,170.00
10 Tons(MOQ)
Reuse More Than 60 Times Construction Material Plastic Formwork Panel for Concrete
US$28.00
50 Pieces(MOQ)
Efficient PVC Insulated Formwork for Permanent Wall Construction Needs
US$1,150.00-1,170.00
10 Tons(MOQ)
12mm 15mm18mm Hollow Plastic Formwork for Construction
US$30.00-38.00
500 Pieces(MOQ)
Lightweight Concrete Panel Formwork Design for Efficient Building
US$12.00-18.00
200 Pieces(MOQ)
Durable Hollow Formwork for Construction
US$22.00-30.00
100 Pieces(MOQ)
High-Quality Durable PP Plastic Formwork for Concrete Projects
US$12.00-18.00
200 Pieces(MOQ)
Polymer Formwork Board Shuttering in Construction for Column
US$24.00
5 PIECE(MOQ)
Solid-Web H20 Timber I-Joist with High Load Capacity for Heavy-Duty Formwork Construction
US$8.56-10.56
100 Pieces(MOQ)



















