SourcingAI
Try for free
Powered by Made-in-China.com
Seat Cushion High Pressure Automatic Foam Injection Molding Machine Mattress Two Component Polyurethane Foam Machine
US$13,000.00
1-4 Pieces
US$6,800.00
5+ Pieces

Product profile

Customization

Available

After-sales Service

Provide

Warranty

1 Year

Model NO.

TOS-207

Type

Polyurethane Foam Machine

Raw Material

Polyurethane

Principle

Blast in the Low-Pressure Type

Automation

Automatic

Computerized

Non-Computerized

Certification

CE

Flow Rate

5-30 Grams Per Second

Type Designation

Tos-207

Barrel Capacity

30L*2

Barrel Capacity2

60L*2

Barrel Specification

Single-Deck

Barrel Specification2

Double-Deck

Texture

Stainless Steel

Transport Package

Wooden Case

Specification

120*100*150

Trademark

shengsai

Origin

China

HS Code

8419899090

Production Capacity

30 Sets Per Month

Key features

Modular Design Flexibility: Users can customize tank components, measurement systems, temperature control, mixing heads, and PLC controllers.
Energy Saving Performance: Saves 35% energy compared to foreign foaming machines with automatic material ratio measurement.
Advanced PLC Control System: Imported PLC monitors equipment, automatically diagnoses abnormalities, and displays alarms with real-time data.
High Precision Mixing: Components are strictly controlled for high mixing accuracy and uniform repeatable results.
Versatile Application Scope: Suitable for car cushions, furniture, refrigerators, building materials, and various polyurethane products.
Efficient Self-Cleaning: Hydraulic drive with self-cleaning mixing head reduces maintenance time and saves costs.
Safety Protection Features: Includes digital pressure gauge and overpressure protection functions for safe operation.
Customization from Samples: OEM and ODM services available with customization options based on customer samples.

Company profile

Dongguan Shengsai Machinery Co., Ltd.
Importers and Exporters
Business Type: Manufacturer/Factory, Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from SamplesExport Year: 2016-08-31Nearest Port: shenzhen, guangzhouAverage Response Time: ≤2.78h

About Our Factory & Business Background

AddressRoom 107, No. 2 Guixuanzhou 4th Road, Shatian Town, Dongguan, Guangdong, China
Terms of PaymentT/T, Western Union, Money Gram, LC, D/P, PayPal, Small-amount payment
International Commercial Terms(Incoterms)FOB, EXW, CFR, CIF
Average Lead TimePeak Season Lead Time: one month Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsPU Foaming Machine, Gluing Machinery, Hot Melt Adhesive Machine, Polyurethane Foaming Machine, Hot Melt Glue Machine, PU Foam Machine, Paper Gluing Machine, PU Foam Spray Machine, PU Dispensing Machine, Polyurethane Machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instructions and uniformly followed
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
New Products Launched in Last yearNo

Product Q&A

Q:What is the warranty period for this machine?
A:
The machine comes with a 1-year warranty and after-sales service support.
Q:Can the machine be customized based on my requirements?
A:
Yes, the machine features a modular design allowing customization of tanks, measurement systems, and controllers. OEM and ODM services are also available.
Q:What types of products can this machine produce?
A:
It produces cold curing soft foam, self-crusting foam, molded buffer parts, and hard foam products for cars, furniture, refrigerators, and building materials.
Q:How does the high-pressure machine differ from the low-pressure one?
A:
High-pressure machines use high pressure to atomize materials in the mixing chamber and do not require cleaning after use, unlike low-pressure machines.
Q:What is the lead time for production?
A:
During peak season, the lead time is one month. During the off-season, it is within 15 workdays.

Send Inquiry

*To:Dongguan Shengsai Machinery Co., Ltd.Dongguan Shengsai Machinery Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like