SourcingAI
Try for free
Powered by Made-in-China.com
Efficient Low Pressure Spray Scrubber Tower for Organic Gas Elimination
US$600.00-7,500.00
1 Piece

Product profile

Customization

Available

Condition

New

Certification

ISO, CE

Model NO.

LYPL-5000

Automation

Automatic

Treatment

Chemical Treatment

Product Name

Spray Tower

Keywords

Spray Tower Scrubber

Specifications

φ1200*3500mm

Air Volume

5000m³/H

Power

2.2kw

Efficiency

99%

Transport Package

Standard Packaging or Customized

Specification

Standard Specifications or Customized

Origin

Hebei, Chian

Production Capacity

50000pieces/Year

Key features

99% Removal Efficiency: High-efficiency counter-current flow design achieves 99% pollutant removal for various gas types.
Low Pressure Drop Design: Optimized hydraulic design ensures low energy consumption while maintaining high scrubbing performance.
Easy Maintenance Access: Strategic inspection doors and removable components reduce downtime and improve worker safety.
Compact Footprint: Vertical tower configuration minimizes installation space compared to horizontal scrubbing systems.
Advanced Spray Nozzles: Precision-engineered nozzles provide uniform liquid distribution and clog-resistant performance.
Flexible Customization: Offers full customization from samples, designs, and minor adjustments to meet specific needs.
ISO & CE Certified: Products comply with international export quality standards and hold ISO and CE certifications.
12-Month Warranty: Comprehensive 12-month free warranty covering material and manufacturing defects upon arrival.

Company profile

Botou Lingyue Environmental Protection Equipment Co., Ltd
Importers and ExportersIn-stock CapacityFast DeliveryQuality Assurance
CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.70h

About Our Factory & Business Background

Address30-2 North Outer Ring Hardware Trade City, Botou City, Cangzhou, Hebei, China
Plant Area1900 square meters
Number of Employees14
Registered Capital800,000 RMB
Terms of PaymentLC, T/T, PayPal, D/P, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, EXW, CFR
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main Productsspray tower, welding fume extractor, industrial dust collector, dust filter bag, filter cage, dust collector
Production MachinesWelding machine, Plate shearing machine, Bending machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2017-12-22
Main MarketsSoutheast Asia, Eastern Asia, Mid East
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How do I request a quote?
A:
Leave a message on our website, send an email, or contact us directly. Provide product model, specifications, quantity, working conditions, and configuration requirements for an accurate quotation.
Q:Can orders be modified after confirmation?
A:
Modifications are possible before production begins. After production starts or materials are procured, changes may incur costs and require mutual negotiation.
Q:What payment methods are accepted?
A:
We accept Telegraphic Transfer (T/T) with a typical 30% deposit and 70% balance before shipment. Other methods like PayPal or bank drafts can be negotiated. We do not accept Letters of Credit (L/C).
Q:How long is the shipment time?
A:
Standard products are shipped within 5-7 business days after full payment. Customized products require a separate production cycle confirmation, with shipment arranged immediately after full payment.
Q:What shipping methods are available?
A:
We offer sea freight (FCL/LCL), international railway, and multimodal transport. Freight is calculated based on volume, weight, destination, and method, with detailed quotes provided in the Proforma Invoice.

Send Inquiry

*To:Botou Lingyue Environmental Protection Equipment Co., LtdBotou Lingyue Environmental Protection Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like