SourcingAI
Try for free
Powered by Made-in-China.com
PP Plastic Spray Scrubber Tower for Commercial Kitchen Exhaust Purification
US$600.00-7,500.00
1 Piece

Product profile

Condition

New

Certification

ISO, CE

Automation

Automatic

Model NO.

LYPL-5000

Treatment

Chemical Treatment

Product Name

Spray Tower

Keywords

Spray Tower Scrubber

Specifications

φ1200*3500mm

Air Volume

5000m³/H

Power

2.2kw

Efficiency

99%

Transport Package

Standard Packaging or Customized

Specification

Standard Specifications or Customized

Origin

Hebei, Chian

Production Capacity

50000pieces/Year

Key features

99% Purification Efficiency: High-efficiency counter-current flow design ensures 99% pollutant removal for gases and particulates.
Low Pressure Drop Design: Optimized hydraulic design and advanced spray nozzles reduce power consumption while maintaining performance.
Easy Maintenance Access: Strategic inspection doors, walkways, and quick-disconnect fittings reduce downtime and maintenance costs.
Compact Footprint: Vertical tower configuration minimizes installation space requirements compared to horizontal systems.
Customizable Specifications: Full customization available from samples, designs, or minor adjustments to meet specific needs.
CE & ISO Certified: Products comply with international export quality standards and hold CE and ISO certifications.
Versatile Application: Suitable for chemical plants, power generation, and manufacturing for effective air pollution control.
Water Recirculation System: Sump and recirculation design conserves water and chemicals while managing dissolved solids and pH.

Company profile

CertifiedBusiness Type: Manufacturer/Factory CertifiedR&D Capacity: ODM Service Available CertifiedCustomization Options: Customization from Samples, Customization from Designs, etc. CertifiedExport Year: 1 year CertifiedNearest Port: Tianjin PortAverage Response Time: ≤0.70h

About Our Factory & Business Background

Address30-2 North Outer Ring Hardware Trade City, Botou City, Cangzhou, Hebei, China
Plant Area1900 square meters
Number of Employees14
Registered Capital800,000 RMB
Terms of PaymentLC, T/T, PayPal, D/P, Western Union, Small-amount payment
International Commercial Terms(Incoterms)FOB, CIF, EXW, CFR
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays
Minimum Order Quantity1 set
Supply Chain Partners5

Our Production Capability & Technical Expertise

Main Productsspray tower, welding fume extractor, industrial dust collector, dust filter bag, filter cage, dust collector
Production MachinesWelding machine, Plate shearing machine, Bending machine
QA/QC inspectors1 people
Inspection Type for Finished Products100% inspection(Visual inspection & Function inspection)
Inspection Method for Finished ProductsHave instruction but no written records
R&D Engineers1 people
Traceability of Raw MaterialsYes

Our Industry Experience & Global Business Record

Year of Establishment2017-12-22
Main MarketsSoutheast Asia, Eastern Asia, Mid East
Repeat Buyers Choice30%~50%
Number of Foreign Trading Staff2
Overseas Agent/BranchNo
New Products Launched in Last yearNo

Our Certifications, Standards & Industry Recognition

Cooperated with Fortune 500No

Product Q&A

Q:How do I request a quote and place an order?
A:
You can request a quote by leaving a message on our official website, sending an email, or contacting us directly. Please provide product information, working conditions, and configuration requirements. After confirmation, we will issue a formal Proforma Invoice (PI).
Q:Can an order be modified or canceled after confirmation?
A:
Modifications or cancellations before production can typically be accommodated. If raw materials have been procured or production has started, changes may incur costs and require mutual negotiation.
Q:What payment methods do you accept?
A:
We support Telegraphic Transfer (T/T) with a typical ratio of 30% deposit and 70% balance before shipment. We also accept PayPal, bank drafts, etc. We do not accept Letters of Credit (L/C).
Q:How long after payment is shipment arranged?
A:
For standard products, shipment is arranged within 5-7 business days after receiving full payment. For customized products, the production cycle needs to be confirmed separately, and shipment follows full payment.
Q:What shipping methods do you offer, and how is freight calculated?
A:
We offer sea freight (FCL/LCL), international railway, and multimodal transport. Freight is calculated based on cargo volume, weight, destination, and shipping method, with detailed quotes provided in the PI.

Send Inquiry

*To:Botou Lingyue Environmental Protection Equipment Co., LtdBotou Lingyue Environmental Protection Equipment Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Industrial Spray Tower for Waste Gas Purification Systems
Made-in-China.com
Industrial Spray Tower for Factory Exhaust Purification
Made-in-China.com
Industrial Spray Tower for Chemical Gas Purification
Made-in-China.com