SourcingAI
Try for free
Powered by Made-in-China.com
Custom Mould for Rotomolding Rotomolded Crossover Plastic Overland Transport Cargo Case
US$5,000.00
1 Set
US$4,500.00
2+ Sets

Product specifications

Customized

Product profile

Customization

Available

Type

Aluminium Casting

Application

Rotomolding Mould

Model NO.

SY561

Material

Aluminium

Function

Sand Cast

Mold Material

Aluminum

Certification

ISO

Warranty

12 Months

Metal Color

Aluminum

Customized

Customized

Condition

New

After-sales Service

1 Year

Mould Material

Aluminum A356

Mould Frame

Customized

Mould Life

10000 Shots

Mould Lead Time

30-35 Days

Transport Package

Export Standard Wooden Case

Specification

Customized

Trademark

Customized

Origin

China

HS Code

8480790000

Production Capacity

8000 Sets Per Year

Key features

Customized Mould Design: Full customization available for mould frame and dimensions based on client sketches or samples.
High-Quality Aluminum Material: Moulds crafted from high-quality Aluminum A356 with no pinholes, ensuring durability.
Fast Lead Time: Mould production completed in 30-35 days after drawing approval and deposit receipt.
Comprehensive Design Support: One-stop service from concept to final design, including CAD and 3D drawing creation.
Free Sample Service: One free sample provided for checking, though freight costs are covered by the client.
ISO Certified Manufacturing: Factory holds ISO certification ensuring adherence to international quality standards.
High Production Capacity: Monthly output of 220-300 pieces per mould with 9 CNC machines and 8 engineers.
Durable Mould Life: Designed for 10,000 shots with consistent wall thickness and minimal material waste.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤1.82hInternational Commercial Terms(Incoterms): FOB, EXW, CIF

About Our Factory & Business Background

AddressRoom 1113, Building 6, Hanxuan Building, Chengbei Road, Jiading District, Shanghai, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsRotomolding Mould, Rotomolding Mold, China Rotomoulder, Rotational Moulding Mould, Rotomold, Rotomolder Mould, Rotomoulder, Pipe Float Mould, Flower Pots Mould, Dust Bin Mould

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the lead time for mould production?
A:
Usually 30-35 days after drawing approval and deposit received.
Q:What information is needed to get a quote?
A:
If you have drawings, we quote based on them. If not, send a sample or idea, and we will scan it and assist in developing the project.
Q:What are the payment terms?
A:
By T/T, Western Union, or L/C. 50% deposit in advance, 50% balance after sample approval (for moulds) or before shipment (for products).
Q:Do you provide samples for checking?
A:
Yes, we offer one free sample, but the client must afford the freight cost.
Q:Can I visit your factory?
A:
Yes, you are welcome to visit us in China to check our capacity and ability.

Send Inquiry

*To:Shanghai Shengye Mould Co., Ltd.Shanghai Shengye Mould Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like