SourcingAI
Try for free
Powered by Made-in-China.com
Mould for Plastic Diesel Fuel Tank Made of Polyethene by Rotomolding Process
US$30,005.00
1 Set
US$4,500.00
2+ Sets

Product profile

Customization

Available

Type

Ordinary Sand Casting

Application

Agriculture

Model NO.

SY288

Material

Aluminium

Function

High Temperature Resistance

Mold Material

Sand Mold

Certification

ISO

Warranty

24 Months

Metal Color

Non-Ferrous Metal

Customized

Customized

Condition

New

After-sales Service

Yes

Mould Material

Aluminum Casting

Mould Lead Time

30 Days

Mould Surface

Polish or Sandblasting

Mould Life

10000 Shots

Transport Package

Wooden Case

Specification

Customized

Trademark

Customized

Origin

China

HS Code

8480790090

Production Capacity

1000 Sets Per Year

Key features

Customized Mould Design: Supports complex shapes, sizes up to 5000L, and specific surface finishes like polish or sandblasting.
High Durability Material: Made from high-quality Aluminum Casting (A356/6061) ensuring no pinholes and long lifespan of 10000 shots.
Fast Production Lead Time: Mould production takes 30-35 days after drawing approval, with monthly output of 220-300 pcs.
One-Stop OEM Service: Full service from concept and 3D design to final product manufacturing with 8 engineers and 9 CNC machines.
Seamless Construction: Rotomolding process creates seamless, one-piece hollow parts with no internal stresses or weld lines.
Cost-Effective Tooling: Low tooling cost with economic pricing, offering competitive rates for high-quality custom moulds.
24 Months Warranty: Comprehensive 24-month warranty coverage for all moulds to ensure quality and reliability.
Export Quality Standard: 90% of products exported to over 20 countries, packaged in export-standard wooden cases.

Company profile

Business Type: Manufacturer/Factory, Trading CompanyAverage Response Time: ≤1.58hInternational Commercial Terms(Incoterms): FOB, EXW, CIF

About Our Factory & Business Background

AddressRoom 1113, Building 6, Hanxuan Building, Chengbei Road, Jiading District, Shanghai, China
Average Lead TimePeak Season Lead Time: 1-3 months Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsRotomolding Mould, Rotomolding Mold, China Rotomoulder, Rotational Moulding Mould, Rotomold, Rotomolder Mould, Rotomoulder, Pipe Float Mould, Flower Pots Mould, Dust Bin Mould

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:What is the lead time for mould production?
A:
Usually 30-35 days after drawing approval and deposit received. For peak seasons, it may take 1-3 months.
Q:What are the payment terms?
A:
We accept T/T, Western Union, or L/C. Typically, 50% deposit in advance and 50% balance before shipment.
Q:Can you provide a free sample?
A:
Yes, we offer one free sample, but the buyer needs to cover the freight cost.
Q:What information is needed for a quote?
A:
You can send drawings, or if you don't have designs, send a sample or idea. We will scan and develop the CAD/3D drawing.
Q:What is the maximum size of the mould?
A:
The biggest size that can be made is 5000 L, with high design flexibility for various shapes and contours.

Send Inquiry

*To:Shanghai Shengye Mould Co., Ltd.Shanghai Shengye Mould Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like