SourcingAI
Try for free
Powered by Made-in-China.com
Complete High-Voltage Power Distribution Solution with Hxgn17-12 Switchgear
US$990.00-2,914.00
1 Piece

Product profile

Customization

Available

Certification

VDE, CCC, ISO9001

Shell Material

Steel Plate

Model NO.

HXGN17-12

Voltage Level

High Voltage

Installation

Fixed

Structure

Cabinet

Current

DC

Rated Voltage

50kv

Rated Frequency

50Hz

Main Bus Rated Current

630ka

Rated Short-Time Withstand Current

20s

Rated Short-Time Withstand Current Durat

4ka

Rated Short-Circuit Closing Current

50ka

Rated Open-Circuit Transformer Breaking

The No-Load Current of The 1250kvtransformer

Fuse Rated Current

20-125A

Transport Package

Export-Grade Fumigation-Free Wooden Crates

Specification

500×916×1885

Trademark

SHENLEAD

Origin

China

HS Code

8537209000

Production Capacity

5000 Pieces/Year

Key features

VDE and CCC Certified: Meets strict safety standards with VDE, CCC, and ISO9001 certifications.
High Voltage Capacity: Rated voltage of 50KV with main bus current up to 630KA.
Customizable Parameters: Rated voltage, frequency, and current options are customizable.
Durable Steel Construction: Robust steel plate shell ensures long-term stability and safety.
Extended Warranty Coverage: Comprehensive warranty ranging from 3 to 10 years for peace of mind.
Professional OEM/ODM Service: Full OEM and ODM support available with minimum order quantity.
Expert Technical Support: 50 professional engineers provide 1-on-1 assistance and on-site service.
Fast Lead Time: Efficient production with lead time within 15 workdays for all seasons.

Company profile

Shenling Energy Technology (Wuhan) Co., Ltd.
High Repeat Buyers ChoiceSelf-brandedPatents AwardedIn-stock Capacity
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2016-06-02Nearest Port: shanghai, ningboAverage Response Time: >24hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressRoom 1703, Tower B, Optics Valley International Chamber of Commerce Building, No. 2-2, Guandongyuan Road, East Lake New Technology Development Zone, Wuhan City
International Commercial Terms(Incoterms)FOB, FCA, CFR, CIF, EXW, Others, DAT, FAS, DDP, DAP, CIP, CPT
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsEnergy Storage System, Electrical Equipment, HVAC

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Are you a manufacturer or trading company?
A:
We are a manufacturer based in SiChuan, China, established in 1998 with over 800 employees.
Q:Do you offer OEM and ODM services?
A:
Yes, we provide OEM and ODM services, subject to a minimum order quantity requirement.
Q:What is the warranty period for your products?
A:
Our warranty period ranges from 3 to 10 years depending on the specific product and terms.
Q:How do you handle after-sales service?
A:
We have 50 professional engineers providing 1-on-1 assistance, including on-site service if necessary.
Q:Can I get a sample before placing an order?
A:
Yes, please leave your contact information, and our sales manager will contact you to arrange a sample.

Send Inquiry

*To:Shenling Energy Technology (Wuhan) Co., Ltd.Shenling Energy Technology (Wuhan) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like