SourcingAI
Try for free
Powered by Made-in-China.com
Microgrid Outdoor Energy Storage System 512V Gss-PC10
US$21,400.00
1-2 Pieces
US$21,390.00
3-4 Pieces
US$21,375.00
5+ Pieces

Product profile

Customization

Available

Application

Industrial Park Peak-Valley Arbitrage

Installation

Cabinet Floor-Mounted

Model NO.

GSS-PC10

Energy Capacity

160.8kwh

Power Configuration

512V 160.8kwh (10pack)

Cycle Life

8000 Cycles (80%DOD)

Cooling Method

Air Cooling System

Combination Mod

16s1p

Fire - Fighting System

Aerosol/Perfluoroketone Optional

Wiring Mode

Side - Entry Wiring

Ambient Temperature (°C)

-20~50 (>45 Requires Derating)

Charging Temperature (°C)

0~55

Discharging Temperature (°C)

-10~55

Transport Package

Fumigation of The Solid Wood Base + Coiling Film +

Specification

1300*1183*1930

Trademark

/

Origin

China

HS Code

8507600090

Key features

Extended Cycle Life: 8000 cycles at 80% depth of discharge for long-term reliability.
Flexible Customization: Optional aerosol or perfluoroketone fire fighting systems available.
Professional Engineering Support: 50 engineers provide 1-on-1 assistance and on-site service.
Comprehensive Product Line: Specializes in PCS, Battery PACK, BMS, EMS, and transformers.
Established Manufacturer: Direct manufacturer based in China with over 800 employees since 1998.
Fast Lead Time: Peak and off-peak season delivery within 15 working days.
Global Shipping Capability: Professional forwarders for safe sea or air battery shipment.

Company profile

Shenling Energy Technology (Wuhan) Co., Ltd.
High Repeat Buyers ChoiceSelf-brandedPatents AwardedIn-stock Capacity
Business Type: Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service AvailableExport Year: 2016-06-02Nearest Port: shanghai, ningboAverage Response Time: >24hTerms of Payment: LC, T/T, D/P, etc.

About Our Factory & Business Background

AddressRoom 1703, Tower B, Optics Valley International Chamber of Commerce Building, No. 2-2, Guandongyuan Road, East Lake New Technology Development Zone, Wuhan City
International Commercial Terms(Incoterms)FOB, FCA, CFR, CIF, EXW, Others, DAT, FAS, DDP, DAP, CIP, CPT
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: within 15 workdays

Our Production Capability & Technical Expertise

Main ProductsEnergy Storage System, Electrical Equipment, HVAC

Our Industry Experience & Global Business Record

Main MarketsNorth America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

Product Q&A

Q:Are you a trading company or manufacturer?
A:
We are a manufacturer based in SiChuan, China, established in 1998 with over 800 employees.
Q:Do you offer OEM and ODM services?
A:
Yes, we provide OEM and ODM services, though a minimum order quantity is required.
Q:What is the warranty period?
A:
Our warranty period ranges from 3 to 10 years depending on the specific requirements.
Q:How do you handle after-sales service?
A:
We have 50 professional engineers offering 1-on-1 assistance, including on-site service if necessary.
Q:Can I get a sample of the product?
A:
Yes, please leave your contact information and our sales manager will contact you soon.

Send Inquiry

*To:Shenling Energy Technology (Wuhan) Co., Ltd.Shenling Energy Technology (Wuhan) Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Microgrid Energy Storage Outdoor Cabinet 128.6kwh Gss-PC8
Made-in-China.com
PV Compatible Outdoor Energy Storage 512V 0.5c Gss-PC10
Made-in-China.com
High Altitude 5000m Outdoor Energy Storage Derated Use Gss-PC10
Made-in-China.com
125kw 261kwh Microgrid Energy Storage System for Remote Areas
Made-in-China.com