Powered by Made-in-China.com
400kVA/320kw Silent Diesel Generator AC Three Phase Power Generator for Data Center Construction Sites with Volvo Engine
US$3,800.00-6,900.00
1 Set
Product profile
Customization
AvailableCooling Method
Water CoolingUnit Model
SD350VModel NO.
SD350VNormal Power
400/320(kVA/Kw)Standby Power
450/350(kVA/Kw)Engine Model
Tad1344geFuel Consumption Rate
194G/Kw.HSpeed Regulation Mode
Electric ControlNumber of Cylinders
L6Cylinder Bore
131mmTrip
158mmDisplacement
12.78LOil Capacity
36LTotal Coolant Capacity
44LOverall Dimensions
3050X1200X1800(mm)Weight
3100kgNoise
<105dB(a)Transport Package
Wooden Pallet+Carton BoxTrademark
SHILIDEROrigin
ChinaProduction Capacity
5000 Sets/YearCompany profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service AvailableExport Year: 2023-02-23 CertifiedNearest Port: Guangzhou PortAverage Response Time: ≤4.16h CertifiedTerms of Payment: LC, T/T, D/P
AI-Powered supplier vetting
SummaryGuangdong Shilide Power Technology Co., Ltd. is a China-based combined business entity established in 2019, operating in Guangdong and associated with the Shilider brand founded in 2009. It researches, produces, and sells diesel, gas, natural-gas, biogas, special-gas, and other generator systems, with stated diesel output ranges of 1.5KW–2000KW and gas output ranges of 10KW–10MW. The supplier reports ISO9001:2015, ISO14001:2015, and ISO45001:2016 certifications, nine production lines, and one-month peak and off-peak lead times. Its descriptions indicate professional R&D, technical and system-integration capabilities, and customer-oriented staff development. However, the supplied information does not establish after-sales performance, financial credibility, completed customer cases, or a clearly evidenced customization process. Some workforce and capability figures are inconsistent across the provided records, so capacity-related conclusions should be treated cautiously.
Supplier typeThe supplier is identified as Guangdong Shilide Power Technology Co., Ltd., a China-based combined business entity established in 2019. It conducts R&D, production, sales, and service activities for diesel and gas generator products, while the Shilider brand is stated to have been founded in 2009.
CertificationsThe supplier reports holding ISO9001:2015, ISO14001:2015, and ISO45001:2016 certificates, covering quality, environmental, and occupational health and safety management systems. These stated certifications provide explicit evidence supporting this field.
R&D capabilityThe supplier explicitly describes R&D activity, a professional R&D team, technological innovation, and products spanning diesel, gas, natural-gas, biogas, special-gas, and other new-energy generator applications. It also reports one year of total R&D engineer experience, which supports the existence of R&D activity but limits the strength of the available evidence on depth and scale.
Production capacityThe supplier offers multiple generator configurations and states diesel single-unit capacity of 1.5KW–2000KW and gas single-unit capacity of 10KW–10MW. It reports nine production lines and one-month lead times in both peak and off-peak seasons, although the slices contain inconsistent workforce-related figures and do not independently verify actual production volume.
Customization capabilityThe supplier states that its professional R&D team can meet different customers' production needs and can provide solutions covering generator sets, heat dissipation, control, power distribution, and gas pretreatment systems. This supports solution adaptation, but no specific customization examples, engineering workflow, minimum order conditions, or delivery records are provided.
Send Inquiry
*To:
Guangdong Shilide Power Technology Co., Ltd.
Guangdong Shilide Power Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Cost Effective Open Frame Diesel Generator Set Continuous Running Emergency Power for Factory Workshop Plaza
US$120,000.00-130,000.00
1 Piece(MOQ)
48kw/60kVA 53kw/66kVA Lovol Power Diesel Generators with 50 Temperature Degree Radiator
US$3,590.00-19,478.00
1 PCS(MOQ)
Silent Type 200KW 250kVA diesel Generator for Mining
US$15,662.00
1 Set(MOQ)
Brh Hot Sale 10kVA Super Silent Diesel Generator 10kw Generators Diesel Soundproof Electric Generator
US$360.00-400.00
1 sets(MOQ)
AC Three Phase 50kVA Diesel Generator with CE ISO Used for Outdoor Energy Needs
US$3,200.00-3,300.00
1 Piece(MOQ)
150kw Open Type Permanent Engine Generator Set Pmg Excited Diesel Generator for Continuous Manufacturing Plant Operation
US$4,000.00-7,500.00
1 Piece(MOQ)
High-Power 2500kVA Diesel Generator for Reliable Standby Operations
US$89,999.00-92,214.00
1 Piece(MOQ)
BRH 5KVA 8KVA 10kVA Diesel Generator with 3 Phase Power Options Available
US$299.00-309.00
1 Piece(MOQ)
Cummins Low Fuel Consumption 100kVA 200kVA 300kVA 400kVA 500kVA Soundproof 3 Phase Silent Power Diesel Generator
US$550.00-1,580.00
1 Set(MOQ)
Cameo 5kw 6kw 7kw 8kw 9kw 10kw Silent Inverter Diesel Generator
US$99.00-399.00
5 Pieces(MOQ)
Saintshine 500kVA 800kVA 1000kVA CE ISO Certified Diesel Generator with Open/Silent /Container Cummins Engine Factory OEM
US$1,380.00-1,800.00
1 Piece(MOQ)



















