Powered by Made-in-China.com
625kVA/500kw Silent Diesel Generator AC Three Phase Power Generator for Data Center Construction Sites with Volvo Engine
US$3,880.00-9,800.00
1 Set
Product profile
Customization
AvailableCooling Method
Water CoolingUnit Model
SD550VModel NO.
SD550VNormal Power
625/500(kVA/Kw)Standby Power
688/550(kVA/Kw)Engine Model
Twd1643geFuel Consumption Rate
199g/Kw.HSpeed Regulation Mode
Electric ControlNumber of Cylinders
L6Cylinder Bore
144mmTrip
165mmDisplacement
16.12LOil Capacity
48LTotal Coolant Capacity
60LOverall Dimensions
3300X1400X2200(mm)Weight
3800kgNoise
<102dB(a)Transport Package
Wooden Pallet+Carton BoxTrademark
SHILIDEROrigin
ChinaProduction Capacity
5000 Sets/YearCompany profile

CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: OEM Service AvailableExport Year: 2023-02-23 CertifiedNearest Port: Guangzhou PortAverage Response Time: ≤4.10h CertifiedTerms of Payment: LC, T/T, D/P
AI-Powered supplier vetting
SummaryGuangdong Shilide Power Technology Co., Ltd. is a China-based combined business entity established in 2019, operating in Guangdong and associated with the Shilider brand founded in 2009. It researches, produces, and sells diesel, gas, natural-gas, biogas, special-gas, and other generator systems, with stated diesel output ranges of 1.5KW–2000KW and gas output ranges of 10KW–10MW. The supplier reports ISO9001:2015, ISO14001:2015, and ISO45001:2016 certifications, nine production lines, and one-month peak and off-peak lead times. Its descriptions indicate professional R&D, technical and system-integration capabilities, and customer-oriented staff development. However, the supplied information does not establish after-sales performance, financial credibility, completed customer cases, or a clearly evidenced customization process. Some workforce and capability figures are inconsistent across the provided records, so capacity-related conclusions should be treated cautiously.
Supplier typeThe supplier is identified as Guangdong Shilide Power Technology Co., Ltd., a China-based combined business entity established in 2019. It conducts R&D, production, sales, and service activities for diesel and gas generator products, while the Shilider brand is stated to have been founded in 2009.
CertificationsThe supplier reports holding ISO9001:2015, ISO14001:2015, and ISO45001:2016 certificates, covering quality, environmental, and occupational health and safety management systems. These stated certifications provide explicit evidence supporting this field.
R&D capabilityThe supplier explicitly describes R&D activity, a professional R&D team, technological innovation, and products spanning diesel, gas, natural-gas, biogas, special-gas, and other new-energy generator applications. It also reports one year of total R&D engineer experience, which supports the existence of R&D activity but limits the strength of the available evidence on depth and scale.
Production capacityThe supplier offers multiple generator configurations and states diesel single-unit capacity of 1.5KW–2000KW and gas single-unit capacity of 10KW–10MW. It reports nine production lines and one-month lead times in both peak and off-peak seasons, although the slices contain inconsistent workforce-related figures and do not independently verify actual production volume.
Customization capabilityThe supplier states that its professional R&D team can meet different customers' production needs and can provide solutions covering generator sets, heat dissipation, control, power distribution, and gas pretreatment systems. This supports solution adaptation, but no specific customization examples, engineering workflow, minimum order conditions, or delivery records are provided.
Send Inquiry
*To:
Guangdong Shilide Power Technology Co., Ltd.
Guangdong Shilide Power Technology Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
5kw Marine Auxiliary Electrical Supply Silent Diesel Electric Power Generator
US$1,799.00-2,799.00
1 Set(MOQ)
Ultra-Quiet Diesel Generator for Reliable Industrial Power Supply
US$5,000.00-170,000.00
1 Piece(MOQ)
60Hz 380V Weichai Generator Set Electric Diesel Power Engine 400kw 500kVA Silent Diesel Generator
US$14,500.00-15,600.00
1 set(MOQ)
500kw Silent Weatherproof Diesel Generator 625kVA Trailer Power Supply with ATS for Construction Mining Agriculture Backup
US$1,000.00-5,000.00
1 Piece(MOQ)
100kVA 200kVA 500kVA Diesel Generator Power Silent Generator Soundproof
US$1,500.00-17,000.00
1 Set(MOQ)
Mini Generator 10kVA 12kVA 15kVA Super Silent Portable Small Diesel Generator for Home
US$1,350.00-1,500.00
1 Set(MOQ)
30kVA 40kVA 50kVA Diesel Power Generator Super Silent Diesel Generator Set Price
US$1,200.00-8,000.00
1 Piece(MOQ)
15kw 20kVA Diesel Power Generator 3 Phase Generador
US$1,500.00-1,800.00
1 Piece(MOQ)
Senior and High Standard 30kVA Powerful Silent Diesel Power Generator
US$3,525.00-4,025.00
1 Set(MOQ)
20FT Containerized 500kw Permanent Magnet Generator Plant Plug & Play Energy Generator Genset for Remote Mine
US$5,000.00-12,000.00
1 Piece(MOQ)
Wholesale 150kVA Soundproof Power Brand New Mobile Weichai Diesel Generator Set
US$10,560.00-11,060.00
1 Set(MOQ)
Silent Generator Set Diesel Power 3 Phase Water Cooled Soundproof 15kw Diesel Generator
US$2,510.00-2,700.00
1 set(MOQ)
250kVA 20kw 20kVA 15 kVA 10kw Kubota Diesel Silent Soundproof Turbine Type Electric Power Generator with Engine
US$1,250.00-3,999.00
1 Set(MOQ)



















