SourcingAI
Try for free
Powered by Made-in-China.com
Temperature Controller Digital Temperature Controller Thermostat
US$18.00
200-499 Pieces
US$17.00
500-999 Pieces
US$15.00
1,000+ Pieces
Sample price:US$50.00/piece.Request sample

Product profile

Customization

Available

Customized

Customized

Certification

RoHS, ISO9001, CE

Model NO.

Stc-1000

Brand

TES

Display Type

LED

Type

Digital Refrigerator Thermostat

Temperature Range

-50°c~99 °c

Usage

Refrigerator, Air Condition

Transport Package

Carton

Specification

59X21X41cm Carton

Trademark

SHINGCHEM

Origin

China

Production Capacity

5000PCS/1month

Key features

Multi-Safety Protections: Features alarm for limit exceedance, sensor error, and refrigeration output delay.
Precise Calibration: Allows temperature calibration and precise control via setting value and difference.
Global Certifications: Certified with RoHS, ISO9001, and CE standards for quality assurance.
Compact Design: Installing size is 71*29 mm, suitable for various appliances like water heaters.

Company profile

Qingdao Shingchem New Material Co., Ltd.
High Repeat Buyers ChoiceExhibition ExperienceOEM ServicesStandardized quality control
Business Type: Manufacturer/FactoryExport Year: 2022-07-13Nearest Port: Ningbo, QingdaoAverage Response Time: ≤3.35hTerms of Payment: LC, T/T, D/P, etc.International Commercial Terms(Incoterms): FOB, EXW, CFR, CIF

AI-Powered supplier vetting

SummaryThe supplier is explicitly identified as a professional technical supplier offering customization from designs and samples, ODM, and OEM services for well-known brands. It has in-stock capability, raw-material traceability, quality assurance, and participation in the Chicago Refrigerant Exhibition. Production information indicates refrigerant-gas output, with stated peak-season lead time of one month and off-season lead times ranging from within 15 workdays to one month across the provided records. However, no new products were launched in the past year, 3D software and SDK services are unavailable, and no overseas agents, branches, warehouses, or showrooms are provided. Quality-related procedures for corrective actions and customer complaints exist but lack written records. The provided information does not establish certifications, financial strength, detailed after-sales performance, or specific customer cases.
Supplier typeThe supplier is explicitly classified as a professional technical supplier. It has participated in an offline trade show, but it does not provide overseas agents or branches and reports zero countries with overseas service coverage.
R&D capabilityThe supplier offers R&D-related customization and ODM services, but it launched no new products in the past year, provides no 3D software design service or SDK, and has no ERP integration for digitalized production, procurement, quality, and logistics management.
Production capacityThe supplier reports in-stock capability, raw-material traceability, random finished-product inspection, one quality inspector, and refrigerant-gas production. Stated lead times are within 15 workdays in one off-season record and one month in both peak- and off-season records; outsourcing controls remain unknown.
Customization capabilityThe supplier explicitly supports customization from customer designs and samples, provides ODM services, and has OEM capability for well-known brands. This is direct evidence of both design-based and sample-based customization capability.

Product Q&A

Q:What safety features does the STC-1000 have?
A:
It includes alarm functions for temperature limit exceedance and sensor errors, plus refrigeration control output delay protection.
Q:What certifications does this product hold?
A:
The product is certified with RoHS, ISO9001, and CE.
Q:What are the main applications for this thermostat?
A:
It is used for refrigerators, air conditioners, water heaters, and cooked food displays.
Q:What are the payment terms?
A:
Payment terms include LC, T/T, D/P, and Western Union.
Q:What is the lead time for production?
A:
Peak season lead time is one month, while off-season lead time is within 15 workdays.

Send Inquiry

*To:Qingdao Shingchem New Material Co., Ltd.Qingdao Shingchem New Material Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like