SourcingAI
Try for free
Powered by Made-in-China.com
The Future of Communication Energy Storage Innovations for Base Stations
US$980.00-49,000.00
1 Piece

Product profile

Customization

Available

Type

Energy Storage

Usage

Electric Power

Model NO.

Energy Storage

Nominal Voltage

48V

Discharge Rate

High Discharge Rate

Electrolyte

Li-ion

Installation

Open Frame

Rechargeable

Chargeable

Cooling Method

Air Cooling

Power

33.12kwh

Voltage

DC Bus Side 42vd-58VDC

Atmospheric Pressure

61kp-113kpa

Protection Level

IP21

Relative Humidity

<95%

Mtbf

>100000 Hours

Efficiency

>95%

Overcurrent Protection

Max:150A

Installation Environment

Indoor

Lightning Protection

Yd5098-2005

Transport Package

Wooding

Specification

680mm*489.5mm*1528mm

Trademark

SINEE

Origin

China

Production Capacity

100000pieces/Year

Key features

One-Stop System Solution: Integrates EMS, BMS, PCS, power distribution, battery, and operation platform for complete energy storage management.
Cost Savings & Arbitrage: Discharges during peak load and charges from grid during low load periods to reduce electricity costs and maximize arbitrage.
Quick Modular Installation: Modular design allows quick disassembly and assembly, completing base station installation in just 15 minutes.
Frontal Maintenance Design: Supports full frontal maintenance without needing reserved maintenance channels, saving valuable base station space.
Triple Protection Safety: Features thermal runaway warning, DC circuit breaker, and explosion-proof structure for safe and stable operation.
Independent Battery Control: Each battery group is independently controlled to prevent circulation risks and ensure system stability.
Intelligent Remote Monitoring: Interconnects thousands of stations for accurate revenue calculation, remote status monitoring, and efficient O&M.

Company profile

Wuhan Sine Electric Technology Co., Ltd
High Repeat Buyers ChoiceYears of Export ExperienceR&D Capabilities
CertifiedBusiness Type: Manufacturer/Factory & Trading Company CertifiedR&D Capacity: ODM Service Available & OEM Service Available CertifiedCustomization Options: Customization from Designs CertifiedExport Year: 14 years CertifiedNearest Port: Shanghai PortAverage Response Time: ≤8.56h

AI-Powered supplier vetting

SummaryShenzhen Sine Electric Co., Ltd (SINEE) is a specialized supplier in technology innovation, with capabilities in R&D and 3D software design services. It has effective quality assurance and customer complaint handling procedures, participates in offline trade shows, and exports a small percentage of its sales. The supplier holds valid manufacturing contracts and offers after-sales services but lacks overseas warehouses and agents.
Supplier typeSINEE is a professional technical supplier, engaged in the development and manufacturing of industrial automation and energy-saving systems, and recognized as a high-tech enterprise.
After-Sales capabilityThe supplier provides after-sales services for its industrial automation and energy-saving systems.
R&D capabilitySINEE is recognized for its innovation, with a focus on technology and new product development over the past year.
Production capacityThe supplier has valid contracts with subcontractors and in-stock service capacity, but no overseas warehouses.
Customization capabilitySINEE offers customization from designs through its design services.

Product Q&A

Q:What is the nominal voltage and discharge rate?
A:
The nominal voltage is 48V with a high discharge rate, suitable for demanding power applications.
Q:What are the power and efficiency specifications?
A:
Available power options include 6kW, 12kW, 18kW, and 24kW, with an efficiency of greater than 95%.
Q:Is customization available for this energy storage system?
A:
Yes, OEM and ODM services are available, including customization from designs and modular capacity expansion.
Q:What is the minimum order quantity (MOQ)?
A:
The minimum order quantity is 1 set, allowing for flexible purchasing options for different project sizes.
Q:What are the payment terms and lead times?
A:
Payment terms are LC or T/T. The average lead time is within 15 workdays for both peak and off-peak seasons.

Send Inquiry

*To:Wuhan Sine Electric Technology Co., LtdWuhan Sine Electric Technology Co., Ltd
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

12V 50ah Photovoltaic System Energy Storage for Backup
Made-in-China.com