SourcingAI
Try for free
Powered by Made-in-China.com
API 5L Steel Pipe for Pipeline Transportation System ASTM A106 Seamless Carbon Steel
US$450.00-850.00
50 Tons
Sample price:US$760.00/ton.Request sample

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Yes

Model NO.

SMLS

Type

Seamless

Technique

Hot Rolled

Material

Carbon Steel

Surface Treatment

Black

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Test

Chemical Component Analysis, Mechanical Properties

Delivery Time

15 Days

Length

6m 12m

Ends

Be PE

Transport Package

by Ocean

Specification

As Required

Trademark

CHIEF STEEL

Origin

China

HS Code

7304399000

Production Capacity

600, 000 Tons

Key features

Wide Material Range: Covers Carbon Steel, Alloy Steel, Stainless Steel, and Spring Steel with various grades.
Customizable Specifications: Length, ends, and chemical analysis can be customized per customer requirements.
High Performance: Resistant to high/low temperatures, high pressure, and corrosion for diverse applications.
Multiple Standards: Complies with ASME, ASTM, EN, BS, GB, DIN, and JIS standards.
Value-Added Services: Offers in-house painting, coating, cutting, welding, and mechanical fabrication.
Quality Assurance: Third-party inspections (e.g., TUV) welcomed; MTC provided with every shipment.
Versatile Applications: Suitable for pipeline transport, boilers, hydraulic systems, oil/gas drilling, and construction.
Flexible Payment: Accepts L/C, T/T, D/A, D/P, Western Union, and MoneyGram.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like