SourcingAI
Try for free
Powered by Made-in-China.com
ASTM A179 Seamless Boiler Tube for Heat Exchanger
US$460.00-800.00
50 Tons

Product profile

Customization

Available

Type

Seamless

Technique

Hot Rolled

Material

Carbon Steel

Surface Treatment

Galvanized

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Transport Package

Exported Standard Package

Trademark

Chief Steel

Origin

China

HS Code

73041100

Key features

Wide Grade Selection: Offers extensive grades including SPCC, Q235, Q345, 42CrMo, and 304/316 stainless steel.
Customizable Dimensions: Thickness ranges from 0.2mm to 115mm; widths up to 3000mm available per request.
Versatile Surface Treatment: Options include galvanized, polished, anodized, coated, and embossed finishes.
High Performance: Designed for high/low temperature, high pressure, and excellent corrosion resistance.
Multiple Application Scenarios: Suitable for boilers, oil pipelines, chemical equipment, drilling, and structural use.
Flexible Packaging: Available in wooden cases, paper, plastic, or foam packaging based on customer needs.
Fast Delivery: Stock items delivered in 5-10 days; non-stock items in 15-20 days depending on quantity.
Comprehensive Standards: Meets ASTM, ASME, EN, BS, GB, DIN, and JIS international standards.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like