SourcingAI
Try for free
Powered by Made-in-China.com
ASTM Stainless Steel Welded Pipe for Industrial Fluid Pipeline
US$1,500.00-1,550.00
1 Ton

Product profile

Customization

Available

Type

Stainless Steel Pipes

Technique

Hot Rolled

Model NO.

Seamless and Welded

Material

TP304,Tp321,Tp321h,Tp316/L,Tp316ti,Tp310s,Tp347

Surface Treatment

Pickling

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Transport Package

in Bundles by Steel Strips/Pallet/Wooden Case

Specification

SGS

Trademark

CHIEF STEEL

Origin

China

HS Code

73044190

Production Capacity

200000 Tons/Year

Key features

Wide Material Range: Available in TP304, 316, 321, 347, 310S and other grades.
Customizable Dimensions: Outer diameter from 6mm to 762mm and thickness 0.5mm to 70mm.
Flexible Delivery Time: 5-10 days for stock items, 15-60 days for custom orders based on quantity.
Comprehensive Certifications: ISO 9001, PED, ASME, and DNV certified for quality assurance.
Multiple Surface Options: Bright, Pickling, and Anti-Corrosion Coating available.
Rigorous Inspection: Hydraulic, Ultrasonic, and X-ray testing included.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication.
Global Shipping Ports: Ships from Shanghai, Tianjin, and Qingdao.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fortunately for you, we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting, coating, pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Premium Stainless Steel Welded Pipe for Manifolds
Made-in-China.com