SourcingAI
Try for free
Powered by Made-in-China.com
Beveled End, High Frequency Welded Carbon Steel Pipe API5l / ASTM A53 / ASTM 252 /API5CT
Negotiable
5 Tons
Sample price:US$550.00/ton.Request sample

Product profile

Customization

Available

Type

Welded

Technique

ERW

Model NO.

ERW STEEL PIPE

Material

Carbon Steel

Surface Treatment

Black

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration

Section Shape

Round

O.D

1/2''-24''

Thickness

1.5mm-15.88mm

Transport Package

with End Caps, in Bundles by Steel Strips

Specification

1/2" - 24" GR. B, X42, X52, X60, X65

Trademark

Chief Steel

Origin

Shanghai, China

HS Code

73061900

Production Capacity

200000 Tons/Year

Key features

Wide Size Range: Outer diameter 1/2''-24'' and thickness 1.5mm-15.88mm available.
Multiple Coating Options: Includes 3LPE, FBE, Bitumen, Liquid Epoxy, and Cement Mortar Lining.
Custom Manufacturing: Production based on customer CAD or design drawings.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication.
Third-Party Inspection: TUV inspections welcomed with MTC and TPI stamping included.
Flexible Delivery: 5-10 days for stock items, 15-20 days for custom orders.
Secure Packaging: Beveled ends with protector caps, bundled in hexagonal steel strips.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like