SourcingAI
Try for free
Powered by Made-in-China.com
Beveled Ends Alloy Seamless Carbon Stee Pipe Smls Tube Asm A106b/ API5l/ API5CT / ASME 36.10
US$400.00-760.00
5 Tons
Sample price:US$400.00/piece.Request sample

Product profile

Customization

Available

Type

Seamless

Technique

Hot Rolled

Model NO.

Seamless steel pipe

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

THK

0.2-4mm or 4-60mm or 60-115mm

Width

500mm-1500mm or 600-3000mm

Production Process

Hot Rolling/Cold Rolling

Delivery Time

7-25days or According to The Product

Transport Package

in Bundles, or in Loose

Specification

Chemical Pipe, Piling, Oil, Tailing Pipe, etc. 20

Trademark

Chief Steel

Origin

China

HS Code

73041100

Production Capacity

200000 Tons/Year

Key features

Wide Customization Options: Customizable thickness, width, and production process to meet specific project requirements.
Multi-Industry Application: Suitable for oil/gas drilling, boiler pipes, hydraulic systems, and chemical industries.
High Performance Standards: Resistant to high/low temperatures, high pressure, and corrosion; meets ASME/ASTM standards.
Flexible Delivery Terms: Delivery within 7-25 days or customized based on product specifications and quantity.
Comprehensive Value-Added Services: Offers in-house painting, coating, cutting, welding, and mechanical fabrication services.
Strict Quality Control: Third-party inspections (e.g., TUV) welcomed; goods released with MTC and TPI stamps.
Secure Packaging Solutions: Options include wooden cases, paper, plastic, and foam packaging tailored to customer needs.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like