SourcingAI
Try for free
Powered by Made-in-China.com
ERW Black Iron Pipe Schedule 40 Black Round Welded Galvanized Steel Pipe
US$330.00-450.00
25 Tons

Product profile

Customization

Available

Type

Welded

Technique

Hot Rolled

Material

Alloy Steel

Surface Treatment

Galvanized

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Transport Package

Export Standard Package or as Request

Specification

DX51D, DX52D, DX53D, SGCC, ASTM A653

Trademark

Chief Steel

Origin

China

Production Capacity

200000 Tons/Year

Key features

Wide Material Selection: Available in 10#, 20#, 45#, 16Mn, A53, Q235, Q345, St37, St42, St52.4 and more.
Extensive Size Range: Outer diameter 20MM-508MM and wall thickness 1MM-12MM to fit various needs.
Multiple Surface Treatments: Options include Galvanized, PVC coating, black/color painting, and anti-rust oil.
Strict Quality Assurance: Certified workshops with piece-by-piece inspection according to national QA/QC standards.
Customization Support: We can produce according to customer samples, technical drawings, and specific requirements.
Versatile Applications: Suitable for pipelines, oil/gas drilling, construction, scaffolding, and machinery industries.
Flexible Delivery Options: Stock items ship within 7 days; production takes 15-30 days after deposit receipt.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤15hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:What are your terms of payment?
A:
30% T/T in advance, the balance 70% before delivery. We will show you the photos of products and package before you pay the balance.
Q:What are the terms of delivery?
A:
EXW, FOB, CIF, CFR, DDU
Q:How do you pack your goods?
A:
Generally, we pack our goods in bundles or coils with rods or belts, we could also pack the goods as the customers' requirement.
Q:What is your delivery time?
A:
For stocks, we could transport the goods to loading port within 7 days after we received your deposit. For production period, it usually takes about 15 days-30 days after receiving the deposit.
Q:Can you produce according to samples?
A:
Yes, we could customer-made by your samples or technique drawings, we could build the mold and fixtures.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Directly Selling Carbon Black Welded Steel Pipe
Made-in-China.com