Powered by Made-in-China.com
Heavy Duty Hfw Carbon Steel Pipe for Mine Tailings Slurry Pipeline
US$550.00
5 Tons
Product profile
Customization
AvailableType
WeldedTechnique
ERWMaterial
Carbon SteelSurface Treatment
VarnishingUsage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose, Pipeline Transport, Oil/Gas Drilling, Machinery inSection Shape
RoundSurface Treatmen
Black VarnishThickness
1.5mm-15.8mmInternal Coating
Cement Mortar Lining; Bitumen Coating; Liquid Epox3lpe/3lpp Standard
DIN30670-1991, Awwac210O.D
1/2"-24"Steel Grades
Gr. a Grbx42X46X52X56X60X65X70, L245 etc.External Coating
3lpe; 2lpe; 2lpp; Fbe; Bitumen; Enamel Tape Hot-ApTransport Package
with End Caps, in Bundles by Steel StripsSpecification
1/2" - 24" GR. B, X42, X52, X60, X65Trademark
Chief SteelOrigin
ChinaHS Code
73061900Production Capacity
30, 000tonKey features
Wide Size Range: Outer diameter from 1/2 inch to 24 inches available.
Diverse Coating Options: Includes 3LPE, 2LPE, FBE, Bitumen, Cement Mortar Lining, and Liquid Epoxy.
Customizable Dimensions: Length can be customized to 6m, 12m, or special requests.
Multiple Steel Grades: Available in Gr. A, X42, X46, X52, X56, X60, X65, X70, and L245.
Strict Quality Control: Third-party inspections like TUV welcomed with MTC and TPI stamping.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication available.
Flexible Payment Terms: Accepts TT, 100% Irrevocable LC at sight, and negotiable terms.
Fast Delivery for Stock: Delivery within 5-10 days for items in stock, 15-20 days for custom orders.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure
Our Industry Experience & Global Business Record
Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East
Product Q&A
Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fortunately for you, we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting, coating, pipe cutting, jointed welding, and make mechanical fabricate per to request.
Send Inquiry
*To:
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
Heavy-Duty 316L 304 Stainless Steel Seamless Pipe for Medical Use
US$1,230.00-1,900.00
1 Ton(MOQ)
Heavy Duty Hot Rolled Carbon Steel Seamless Pipe for Pipeline Networks with Threaded End Joints
US$700.00-900.00
1 Ton(MOQ)
Heavy-Duty Galvanized Steel Scaffolding Pipe for Reliable Construction
US$550.00-580.00
1 Ton(MOQ)
Heavy-Duty Carbon Steel Welded Pipe for Municipal Engineering
US$500.00-630.00
20 Tons(MOQ)
ASTM A36 Mechanical Seamless Steel Pipe for Heavy-Duty Structures
US$590.00-760.00
1 Ton(MOQ)
ASTM A335 Large Diameter Carbon Steel Welded Pipe for Heavy Machinery
US$590.00-760.00
1 Ton(MOQ)
Heavy Duty Cold Rolled Rectangular Galvanized Steel Pipe for Greenhouse Frame
US$480.00-600.00
15 Tons(MOQ)
ASTM A106 Seamless Pipe for Heavy-Duty Boiler Use
US$590.00-760.00
1 Ton(MOQ)
High Performance 35CrMo Carbon Steel Seamless Pipe for Heavy Duty Applications
US$500.00-750.00
1 Ton(MOQ)
Large Diameter Hot Rolled Carbon Seamless Steel Pipe for Heavy Duty Equipment & Infrastructure
US$1,980.00-2,120.00
5 Tons(MOQ)
Premium 4-Inch Heavy-Duty Galvanized Steel Pipe for Industry
US$550.00-580.00
1 Ton(MOQ)
Large Diameter Seamless Steel Pipe for High Pressure Pipeline with Heavy Duty Anti-Corrosion Surface
US$700.00-1,200.00
1 Ton(MOQ)
Hot Rolled Heavy Wall Carbon Seamless Steel Pipe for Heavy Duty Equipment Structural Components
US$1,980.00-2,120.00
5 Tons(MOQ)
Heavy-Duty 48mm Galvanized Steel Scaffolding Pipe for Construction
US$500.00-630.00
20 Tons(MOQ)



















