SourcingAI
Try for free
Powered by Made-in-China.com
Heavy Wall Hf Welded Carbon Steel Pipe for Oil & Gas Pipeline Projects
US$550.00-600.00
5 Tons

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Yes

Model NO.

HFW

Type

Welded

Technique

ERW

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Transport Package

with End Caps, in Bundles by Steel Strips

Specification

1/2" - 24" GR. B, X42, X52, X60, X65

Trademark

Chief Steel

Origin

China

HS Code

73061900

Production Capacity

200000 Tons/Year

Key features

Wide Size Range: Outer diameter from 1/2 to 24 inches with thickness 1.5mm to 15.88mm.
Multiple Coating Options: Offers 3LPE, 2LPE, FBE, Bitumen, and cement mortar lining for corrosion protection.
Customizable Dimensions: Length can be customized based on special requests beyond standard 6m or 12m.
Strict Quality Control: Third-party inspections like TUV welcomed with MTC and TPI stamping included.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication available.
Flexible Payment Terms: Accepts TT, 100% Irrevocable LC at sight, and negotiable terms.
Fast Stock Delivery: Delivery in 5-10 days for stock items, 15-20 days for production items.
Free Sample Policy: Free samples provided, buyer covers freight costs only.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fortunately for you, we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting, coating, pipe cutting, jointed welding, and make mechanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Premium Stainless Steel Welded Pipe for Manifolds
Made-in-China.com