SourcingAI
Try for free
Powered by Made-in-China.com
High Frequence Welded Carbon Steel Pipe&Tube API5l / ASTM A53 / ASTM 252 /API5CT/6m Fixed 12m Fixed or Required
US$550.00
5 Tons

Product profile

Customization

Available

After-sales Service

Yes

Type

Welded

Model NO.

HFW

Technique

ERW

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose, Pipeline Transport, Oil/Gas Drilling, Machinery in

Section Shape

Round

Model No.

API5l Psl1/ Psl2 ASTM A53

Surface Treatmen

Black Varnish, 3lpe, 3lpp, Fbe

Thickness

1.5mm-15.8mm

Internal Coating

Cement Mortar Lining; Bitumen Coating; Liquid Epox

3lpe/3lpp Standard

DIN30670-1991, Awwac210

O.D

1/2′′-24′′

Steel Grades

Gr. a Grbx42X46X52X56X60X65X70, L245 etc.

External Coating

3lpe; 2lpe; 2lpp; Fbe; Bitumen; Enamel Tape Hot-Ap

Steel Standrad

API 5L-2009; ISO3183-2007;DIN30670

Transport Package

with End Caps, in Bundles by Steel Strips

Specification

1/2" - 24" GR. B, X42, X52, X60, X65

Trademark

Chief Steel

Origin

China

HS Code

73061900

Production Capacity

30, 000ton

Key features

Wide Range of Steel Grades: Available in Gr. A, GrBx42/46/52/56/60/65/70, L245, and more.
Extensive Coating Options: Includes 3LPE, 2LPE, FBE, Bitumen, Cement Mortar Lining, and more.
Flexible Length Customization: Offers 6m fixed, 12m fixed, or custom lengths based on request.
Comprehensive Quality Control: Third-party inspections (TUV) welcomed with MTC and TPI stamping.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication.
Fast Delivery for Stock Items: 5-10 days for in-stock goods, 15-20 days for non-stock items.
Free Sample Availability: Free samples provided, buyer covers freight costs only.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

ERW Welded Carbon Steel Tube with En 10219 ASTM A500
Made-in-China.com