SourcingAI
Try for free
Powered by Made-in-China.com
High Strength Coated SSAW Steel Pipe for Water Pipeline Systems
US$450.00-1,000.00
5 Tons

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Yes

Model NO.

SSAW

Type

Welded

Technique

SAW

Material

Carbon Steel

Surface Treatment

Black

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Trade Term

Fob CFR CIF

Delivery Time

15-30days

Transportation

by Ocean

Payment

Tt LC

Transport Package

in Bulk

Specification

CE, AS, JIS, EN

Trademark

Chief Steel

Origin

China

HS Code

73051900

Production Capacity

200000 Tons/Year

Key features

Customizable Dimensions: Length can be customized from 12m to 80m per request.
Wide Material Range: Available in GR.B-X80, S275JR, S355J0H, S355J2H, St52-0, etc.
Multiple Surface Treatments: Options include bare, oil, bitumen, 1-3 layer PE, and Juton coating.
Comprehensive Quality Testing: Includes hydraulic, eddy current, infrared, X-ray, and chemical/physical inspections.
Third-Party Inspection Support: TUV and other third-party inspections are welcomed with MTC provided.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication available.
Flexible Delivery Time: 15-60 days depending on quantity; 5-10 days for stock items.
Free Sample Availability: Samples offered free of charge, excluding freight costs.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤15hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like