SourcingAI
Try for free
Powered by Made-in-China.com
Hot Expanded Seamless Steel Pipe with Plain Ends for Industrial Applications
US$400.00-760.00
5 Tons

Product profile

Customization

Available

Type

Seamless

Technique

Hot Rolled

Model NO.

Seamless Steel Pipe

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Thickness

0.2-4mm or 4-60mm or 60~115mm

Width

500-1500mm or 600~3000mm

Production Process

Hot Rolling/ Cold Rolling

Transport Package

in Bundles, or in Loose

Specification

Chemical Pipe, Piling, Oil, Tailing Pipe, etc. 20

Trademark

Chief Steel

Origin

China

HS Code

73041100

Production Capacity

200000 Tons/Year

Key features

Wide Material Range: Offers extensive grades including SPCC, Q235, Q345, 304, 316, and various alloy steels.
Customizable Specifications: Thickness 0.2-115mm, Width 500-3000mm, and dimensions tailored to customer CAD drawings.
Multiple Surface Treatments: Available options include varnishing, galvanizing, polishing, anodizing, coating, and embossing.
Comprehensive Standards: Complies with ASME, ASTM, EN, BS, GB, DIN, JIS, and other international standards.
Versatile Applications: Suitable for oil pipelines, structural use, boilers, chemical equipment, and automotive parts.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication available upon request.
Flexible Delivery: 5-10 days for stock items, 15-20 days for custom orders, depending on quantity.
Quality Assurance: Third-party inspections (e.g., TUV) welcomed; all goods come with MTC and TPI stamps.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤11.79hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like