SourcingAI
Try for free
Powered by Made-in-China.com
HSS Rss Square Tubes Steel Pipe ASTM 500gra Grb 6 Meter 3/16"
US$460.00-860.00
50 Tons

Product profile

Customization

Available

Standard

AISI, JIS, ASTM, DIN, BS, GB

Certification

ABS, RoHS

Model NO.

1/2" TO 120" carbon steel pipe

Technique

Hot Rolled

Wall Thickness

Thick

Surface Treatment

Galvanized

Alloy

Non-alloy

Shs

20X20mm-800X800mm

Rhs

20X30mm-400X800mm

Transport Package

Exported Standard Package

Specification

20-800mm

Trademark

Chief Steel

Origin

China

HS Code

7306610000

Production Capacity

20000000

Key features

Wide Size Range: SHS 20x20mm-800x800mm and RHS 20x30mm-400x800mm available.
Multiple Steel Grades: Includes Q235B, S355JR, SS400, S304, S316L, and more.
Various Surface Treatments: Options include Hot Dipped Galvanized, Black, Painted, Oiled, Sand Blasting.
Global Standards Compliance: Meets ASTM A500, DIN EN 10210/10219, JISG 3466, and GB/T standards.
Customization Available: Produce according to customer requirements, CAD, or design drawings.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication.
Third-Party Inspection: TUV inspections welcomed; goods released with MTC stamped by TPI.
Flexible Trade Terms: Accepts EXW, FOB, CFR, CIF, and LC payment terms.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤7.33hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fortunately for you, we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting, coating, pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like