SourcingAI
Try for free
Powered by Made-in-China.com
Industrial Seamless Carbon Steel Boiler Pipe for High Temperature Service
US$460.00-800.00
50 Tons

Product profile

Customization

Available

Type

Seamless

Technique

Hot Rolled

Material

Carbon Steel

Surface Treatment

Galvanized

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Transport Package

Exported Standard Package

Trademark

Chief Steel

Origin

China

HS Code

73041100

Key features

Extensive Grade Coverage: Offers cold/hot rolled coils and various grades including SPCC, Q235, Q345, A36, and alloy steels.
Wide Dimension Range: Thickness 0.2-115mm, Width 500-3000mm, suitable for diverse structural and pipeline needs.
Customization Available: Accepts CAD or design drawings to produce pipes according to specific customer requirements.
Versatile Surface Treatment: Options include drawing, polishing, anodizing, coating, galvanizing, and embossing.
Multiple Application Scenarios: Used for boilers, oil drilling, chemical fertilizer, ships, automobiles, and hydraulic cylinders.
Comprehensive Standards Compliance: Meets ASME, ASTM, EN, BS, GB, DIN, JIS, and other international standards.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication available upon request.
Flexible Payment Terms: Accepts L/C, D/A, D/P, T/T, Western Union, and MoneyGram for offline orders.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like