SourcingAI
Try for free
Powered by Made-in-China.com
Irrigation Pipes / Seamless Carbon Stee Pipe Asm A106b/ API5l/ API5CT / ASME 36.10
US$400.00-460.00
5 Tons

Product profile

Customization

Available

Type

Seamless

Technique

Hot Rolled

Model NO.

seamless steel pipe

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Transport Package

in Bundles, or in Loose

Specification

20MM-762MM

Trademark

Chief Steel

Origin

China

HS Code

73041100

Production Capacity

200000 Tons/Year

Key features

Customizable Specifications: Dimensions and thickness can be tailored to customer requirements with CAD or design drawings provided.
Comprehensive Value-Added Services: In-house capabilities for painting, coating, cutting, welding, and mechanical fabrication per request.
Third-Party Inspection Support: Welcomes inspections by TUV and provides MTC with goods stamped by TPI for quality assurance.
Versatile Application Scope: Suitable for oil/gas drilling, boiler pipes, hydraulic systems, chemical industry, and construction.
Flexible Payment Options: Accepts L/C, D/A, D/P, T/T, Western Union, and MoneyGram for offline orders.
Fast Delivery Time: 5-10 days for stock items, 15-20 days for non-stock items, subject to quantity.
Free Sample Availability: Samples provided free of charge, though freight costs must be covered by the customer.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Boiler Tubes Seamless Carbon Stee Pipe A106b
Made-in-China.com