Powered by Made-in-China.com
Piling Pipe/Welded Steel Pipe/ASTM A53 /A252 SSAW Piling Pipe for Marine Construction
US$460.00-860.00
50 Tons
Product profile
Customization
AvailableType
WeldedTechnique
Hot RolledModel NO.
LSAW pipeMaterial
Carbon SteelSurface Treatment
BlackUsage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special PurposeSection Shape
RoundTransport Package
OceanSpecification
323mm-3000mmmTrademark
Chief SteelOrigin
ChinaHS Code
7306309000Key features
Customizable Steel Pipe: Produce according to your requirements, accept CAD or design drawings.
Third-Party Inspection: TUV inspections welcomed; goods released with MTC and stamped by TPI.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication.
Fast Delivery Options: 5-10 days for stock items; 15-20 days for non-stock based on quantity.
Free Sample Offer: Free samples provided, buyer only pays for freight costs.
Flexible Trade Terms: Accept EXW, FOB, CFR, CIF, and LC payment terms.
Company profile
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤11.79hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW
About Our Factory & Business Background
AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month
Our Production Capability & Technical Expertise
Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure
Our Industry Experience & Global Business Record
Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East
Product Q&A
Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.
Send Inquiry
*To:
Chief Steel (Shanghai) Trading Co., Ltd.
Chief Steel (Shanghai) Trading Co., Ltd.*Content:
Supplier replies will be sent to your registered email
You may also like
UL FM Approval ASTM A797 A53 Sch10 Sch40 Metallic Sprinkler Fire Protection Carbon Steel Pipe
US$630.00-700.00
25 Tons(MOQ)
Grooved ERW Epoxy Painted Welded Steel Pipe for Fire Fighting
US$700.00-850.00
1 Ton(MOQ)
ASTM A53/A500 Welded Carbon Steel Pipe Squre Tube for Construction & Fencing
US$400.00-520.00
5 Tons(MOQ)
Tianjin Ruitong Iron and Steel Gal Pipe Crimped with Welded Cap 76mm As1163: 2016 Galvanized Pipe
US$500.00-650.00
1 Ton(MOQ)
ASTM A53/A500 Hot-DIP Galvanized Steel Pipe for Scaffolding/Water Supply
US$459.00-559.00
10 Tons(MOQ)
ASTM A53 A106 ANSI 4140 4145 Alloy Steel Industrial Pipe Seamless Carbon Steel Pipe Made in China
US$600.00-750.00
5 Tons(MOQ)
ASTM A53 A795 Sch10 Sch40 Grooved or Threaded Fire Protection ERW Welded Carbon Steel Pipe
US$550.00-650.00
10 Tons(MOQ)
Large Diameter LSAW Steel Pipe 3PE Coated for Oil and Gas Pipeline
US$500.00-600.00
25 Tons(MOQ)
Thin Welded Pipe, ASTM A53 B, 219X3.8mm 273X4.8mm 323X5.5 Water
US$500.00-700.00
50 Pieces(MOQ)
Grade B, St52, St35, St42 X42, X56, X60, X65, X70 Psl1 Seamless Carbon Steel Pipe for Oil Gas Transmission
US$468.00-486.00
5 Tons(MOQ)



















