SourcingAI
Try for free
Powered by Made-in-China.com
Plain Ends / Seamless Carbon Stee Pipe Asm A106b/ API5l/ API5CT / ASME 36.10
US$400.00-460.00
5 Tons

Product profile

Customization

Available

Type

Seamless

Technique

Hot Rolled

Model NO.

seamless steel pipe

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Transport Package

in Bundles, or in Loose

Specification

20MM-762MM

Trademark

Chief Steel

Origin

China

HS Code

73041100

Production Capacity

200000 Tons/Year

Key features

Comprehensive Material Grades: Offers extensive grades including SPCC, Q235, Q345, A36, SS400, and various alloy steels.
Wide Dimension Range: Thickness from 0.2mm to 115mm, Width up to 3000mm, and various outer diameters available.
Multiple Manufacturing Types: Includes hot rolled, cold drawn, precision, hot expansion, cold spinning, and extrusion pipes.
Customization Capability: Custom sizes and specifications available based on customer CAD or design drawings.
Value-Added Services: In-house painting, coating, pipe cutting, welded joints, and mechanical fabrication services.
Third-Party Inspection: Third-party inspections like TUV are welcomed with MTC and TPI stamping included.
Fast Delivery Options: 5-10 days for stock items, 15-20 days for non-stock items depending on quantity.
Flexible Payment Terms: Accepts L/C, T/T, D/A, D/P, Western Union, and MoneyGram for offline orders.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤24hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And alsoaccording to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD ordesign drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like