SourcingAI
Try for free
Powered by Made-in-China.com
Seamless Steel Pipe for Boiler Economizer and Thermal Heating Systems
US$650.00
25 Tons

Product profile

Customization

Available

After-sales Service

Yes

Warranty

Yes

Model NO.

Boiler Pipes

Type

Seamless

Technique

Hot Rolled

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Square

Delivery Time

15days

Test

as Required

Trade Term

Fob CFR CIF

Country of Origin

China

Transport Package

in Bundle

Specification

As Required

Trademark

Chief Steel

Origin

China

HS Code

730519

Production Capacity

2000, 000ton

Key features

Customizable Dimensions: Length available in 6m, 12m, or based on special request.
Wide Size Range: Outer diameter from 1/2 inch to 24 inches, thickness 1.5mm-15.88mm.
Multiple Coating Options: Internal: cement mortar, epoxy. External: 3LPE, FBE, bitumen, polyurethane.
Flexible MOQ: Minimum order quantity starts at 5 tons with lower pricing for larger orders.
Value-Added Services: In-house painting, coating, cutting, welding, and mechanical fabrication available.
Third-Party Inspection: TUV and other third-party inspections welcomed with MTC and TPI stamping.
Free Samples Available: Free samples provided, buyer covers freight costs only.
Global Trade Terms: Accepts EXW, FOB, CFR, CIF, LC, T/T, and D/P payment methods.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fortunately for you, we are very experience in this industry. We have equipped our warehouse with the necessities to perform in-house painting, coating, pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like

Tp316L Seamless Stainless Steel Pipe for Oil and Gas
Made-in-China.com