SourcingAI
Try for free
Powered by Made-in-China.com
Socket Ends Seamless Carbon Steel Pipe ASTM A106 for High Temperature Use
US$400.00-760.00
5 Tons

Product profile

Customization

Available

Type

Seamless

Technique

Hot Rolled

Model NO.

Seamless Steel Pipe

Material

Carbon Steel

Surface Treatment

Varnishing

Usage

Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose

Section Shape

Round

Thickness

0.2-4mm or 4-60mm or 60~115mm

Width

500-1500mm or 600~3000mm

Production Process

Hot Rolling/ Cold Rolling

Transport Package

in Bundles, or in Loose

Specification

Chemical Pipe, Piling, Oil, Tailing Pipe, etc. 20

Trademark

Chief Steel

Origin

China

HS Code

73041100

Production Capacity

200000 Tons/Year

Key features

Extensive Grade Coverage: Supports over 100 grades including ASTM, EN, JIS, GB, and DIN standards for seamless carbon and alloy steel.
Customization Available: Manufacturing tailored to customer requirements with CAD or design drawings provided.
Wide Thickness Range: Available thickness from 0.2mm to 115mm to suit various structural and pipeline applications.
Versatile Surface Treatment: Options include drawing, polishing, anodizing, coating, galvanizing, and embossing.
High Performance: Designed for high temperature, high pressure, low temperature, and corrosion resistance environments.
Value-Added Services: In-house capabilities for painting, coating, cutting, welding, and mechanical fabrication.
Flexible Delivery: Delivery time ranges from 5-10 days for stock items to 15-20 days for custom orders.
Quality Assurance: Third-party inspections like TUV welcomed; all goods come with MTC and TPI stamping.

Company profile

Chief Steel (Shanghai) Trading Co., Ltd.
Experienced TeamImporters and ExportersHigh Repeat Buyers ChoiceCooperated with Fortune 500
Business Type: Manufacturer/Factory, Trading CompanyExport Year: 2016-10-01Nearest Port: Shanghai, TIANJIN, QINDAOAverage Response Time: ≤18hTerms of Payment: LC, T/T, D/PInternational Commercial Terms(Incoterms): FOB, CFR, CIF, EXW

About Our Factory & Business Background

AddressRoom 1515, Building 6, No. 5000 Gonghexin Road, Baoshan, Shanghai, China
Average Lead TimePeak Season Lead Time: within 15 workdays Off Season Lead Time: one month

Our Production Capability & Technical Expertise

Main ProductsSteel Pipe, ERW Pipe, SSAW, Carbon Steel, Tube, Welded Pipe, Piling Sheet, Fittings, Elbow, Structure

Our Industry Experience & Global Business Record

Main MarketsSouth America, Eastern Europe, Southeast Asia, Africa, Mid East

Product Q&A

Q:How about the quality?
A:
Third party inspections are always welcomed, like TUV. All of the goods will be released together with MTC and stamped by TPI.
Q:How long is the delivery time?
A:
Generally about 5-10 days if the goods in stock. Or will be 15-20 days if the goods are not in stock. And also according to the quantity.
Q:Do you provide samples? Free or not?
A:
Yes, we could offer the sample for free but do not pay the cost of freight.
Q:May I customize the steel pipe?
A:
Sure you can, we can produce according to your requirement, you can send the CAD or design drawing.
Q:Any value-added Services?
A:
Fottunately for you,we are very experience in this industry. We have equipped our warehouse with the necessitiesto perform in-house painting,coating,pipe cutting, jointed welding, and make machanical fabricate per to request.

Send Inquiry

*To:Chief Steel (Shanghai) Trading Co., Ltd.Chief Steel (Shanghai) Trading Co., Ltd.
*Content:
0/4000

Supplier replies will be sent to your registered email

You may also like